2014 Southwest Region Construction Conference

2014 Southwest Region Construction Conference. WisDOT - Bureau of Structures Matt Coupar and Bill Dreher. Contact BOS – When & Why?. Anything “structural” – change in loading, structural capacity, pile locations If in doubt, call us! See Structures Contacts Handout BOS Contacts.doc

olive
Download Presentation

2014 Southwest Region Construction Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2014 Southwest Region Construction Conference WisDOT - Bureau of Structures Matt Coupar and Bill Dreher

  2. Contact BOS – When & Why? Anything “structural” – change in loading, structural capacity, pile locations If in doubt, call us! See Structures Contacts Handout BOS Contacts.doc Remind Contractor to go thru Construction Staff for answers

  3. Removal Issues

  4. Strip Seal Joints Proper rebar clearance Release welded tabs prior to deck set

  5. Erosion/Grading @ Wings Plan details for fill at wing tips Proper Fill = Minimize Future Erosion

  6. Ancillary Structures - Bolting Overhead sign supports, sign bridges, traffic signal monotubes, high mast light poles Inspect at time of installation Proper lubrication of bolts is critical New – bolt suppliers paperwork should include suppliers rotational capacity test New – Pre-installation test for direct tension indicator (DTI) washers - contractor should submit form DT2322 to engineer Schedule with SW bridge maintenance ancillary inspector an in service initial inspection prior to opening to traffic

  7. 526.3.3 Temporary Structures • Inspect temporary structures before opening to traffic • Conform to NBIS & department’s structure inspection manual • Guidance in CMM: Chapter 5 Structures • Contractor’s Responsibility • Included in Std. Spec. 526.3.3 • Submit DT2007 to the engineer & BOS Maintenance Section • Inspector must be department-certified active team leader • List online – see CMM

  8. Bridge Approaches • New Structural Approach Slabs • US Highways & Interstates

  9. Accelerated Bridge Construction Bridge Manual – ABC chapter Recently Completed WisDOT projects: Precast pier columns & pier caps; Inverted T girders; SPMT move.

  10. Pile Driving Records Submit electronic copy via email. Pile forms: dt1315.xls dt1924.doc

  11. DECK POURS Probing during deck pour and dry run Top Cover Deck thickness

  12. Masonry Anchors • Upcoming change for 2015 • New installation requirements: • ACI/CRSI Certified Installer, or • Field Verification by Non-Destructive Pullout Testing • Implementation as a part of (and guidance provided in) 2015 Standard Specifications

  13. Material Product Std. spec.“As approved by the Engineer” Does not have to be on Approved Products list. Engineer should read manufacturer’s information and determine if it is appropriate.

  14. Conclusion Call us with Questions We look forward to another great year of bridge construction! THANK YOU!

  15. Any Questions?