NCEP Production Suite. Production Suite 425 codes – 11 utilizing message passing 2.1 million lines of code & script Major Model Runs Rapid Update Cycle – 40 Km/40 Lvl (Hourly) Eta Model – 22 Km/ 50 Lvl (4 times daily – 60 hrs) NGM (twice daily)
E N D
NCEP Production Suite • Production Suite • 425 codes – 11 utilizing message passing • 2.1 million lines of code & script • Major Model Runs • Rapid Update Cycle – 40 Km/40 Lvl (Hourly) • Eta Model – 22 Km/ 50 Lvl (4 times daily – 60 hrs) • NGM (twice daily) • Aviation Run – T170 (4 times daily – on-time 120hrs, off-time 84 hrs) • Medium Range Forecast (Once per day – 16 days) • Global Ensembles (12 members twice daily, T62) • Global Data Assimilation (4 times daily) • Hurricane (on demand – 4 storms, 4 times daily)
2000 Highlights • Eta Model • 22 km/40 lvl – September • On-time extended to 60 hrs • Off-time 48 hrs • Global Model • T170/48 lvl – January • On–time extended to 126 hrs • Off-time 84 hrs • GFDL Hurricane Model • Forecast extended to 120 hr - June • Up to 4 storms, 4 times daily
2000 HighlightsContinued • Wave Model • Global NWW3 replaced WAM – March • Regional model covering NW Atlantic – March Regional model coving Gulf of Alaska – March • NGM • Frozen in Time • Running from the Eta Analysis • No plans to remove in near future • Global Ensembles • T62 T126 from 0-60 hrs - July
Planned Implementations • Eta Model • Extend runs to 84 hrs – January • Available on NCEP ftp server until NCF can evaluate resource requirements • Assimilate Precip, Upgrade land-surface model – April • FOUS to 60 hrs – May • Nested “Threats runs” – June • Available on NCEP ftp server • 12 km/60 lvl – November • RUC • 20 km/50 lvl – July