1 / 13

External Web Services Update

Presentation on the updates and changes made in the EIS 1.19 version of the External Interface Specification. Includes an overview, review of specific sections, and Q&A session.

ortiza
Download Presentation

External Web Services Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. External Web Services Update Nodal Implementation Team Presentation June 22, 2009 http://nodal.ercot.com 1

  2. Agenda • External Interface Specification • Overview • Version 1.19 Changes Review • Comments / Questions Received • EIS Market Information Services Update • Background • Interface Review • Q&A

  3. Overview • EIS 1.19 was released for comment on 6/5/09 • Comments closed on 6/19/09 • Most feedback received were general questions • Still processing / responding to several comments received Friday afternoon 6/19/09 • Sandbox • Current Sandbox implementation is 1.18 • 1.19 is targeted for Sandbox release on 7/7/09

  4. EIS 1.19 Changes Review by Section • 2.3.6 - New Section - Enforced Precision information. • Market Submission and outbound Notifications (alerts, awards, etc.) enforced at XSD level – inbound & outbound • MW & MWh values - Enforcement of tenths of MW • Prices: 2 decimal digits (cents) • 2.3.7  - New section - XML Special characters • Handling of reserved characters in XML payloads (i.e., in Outage Creation “comments” field – use of &, ‘, “ etc.) • 2.6  - Removal of the SLA numbers - referred to the ERCOT EDS SLA http://www.ercot.com/services/sla/

  5. EIS 1.19 Changes Review by Section • 3.3.9 – DC Tie Schedule – NERCTag is now part of the Energy Schedule (MMS5 addition)

  6. EIS 1.19 Changes Review by Section • 4.0 Market Info updates: • 4.3.8 Forecasted Load – • Removed start/end time – Returns last available forecasted load values for next 7 days. • 4.3.10 – MarketTotals – • Removed start/end time- added OperatingDate – • Returns market Total energy bought or Sold in DAM for the requested Operating Date • 4.3.11 – LMPs/SPPs – • Added Request/OperatingDate for DAM Market type • Limited start/end time for RTM Market Type • 4.3.12 – MCPCs • Use TradingDate instead of StartTime/EndTime.  • Simplified the MCPCs structure • 4.3.13 – Binding Constraints – • Added Request/OperatingDate for DAM & DRUC market type – limited to end time for HRUC • 4.3.16 –Dynamic Ratings • Limited to EndTime on input.  Returning 7 day data. • 4.3.19 – LoadRatioShares – • Limited to OperatingDate- returning full requested day information • 4.3.20 - CompetitiveConstraints • Limited to OperatingDate on input.  Returning full requested day information. • 4.3.24- AggregatedASOfferCurves • Limited to OperatingDate on input.  Returning full requested day information for DAM and all SASMs found.

  7. EIS 1.19 Changes Review by Section • 4.0 Market Info updates: • 4.3.25 – ASServicePlan • Corrected the example • 4.3.27 – StartupShutdownInstructions – • Added report Date, Option addition for MarketType – replaced Start/EndTime with Trading Date • 4.3.28 – TotalASOffers • Limited to OperatingDate on input.  Returning full requested day information for DAM market. • 4.3.29 – TotalEnergys • Limited to OperatingDate on input.  Returning full requested day information for DAM market. • 4.3.31 – WeatherInfo • Limited to OperatingDate on input.  Returning full requested day information. • 4.3.39 - WGRPP • Limited to EndTime on input.  Returning hourly data for the requested hour. • 4.3.40 – STWPF • Limited to OperatingDate on input.  Returning full requested day information. • New 4.0 Market Info Interfaces: • 4.3.49 – New Interface: MarketInfo: EndAdjPeriod • 4.3.50 – New Interface: MarketInfo: TwoHrNotif • 4.3.51 – New Interface: MarketInfo: P2ValidationSet

  8. EIS 1.19 Changes Review by Section • 5.3.1.1 updated the MMS alerts – • Added DRUC-CLOSE-NOTF • 12.3.1 – Verbal Dispatch Instructions (VDI):  MMS5 • Made “currentOprLevel” and “resource” elements optional • Added “finalOprLevel” and “finalState” elements • 10.2. – Resource Parameters –  MMS5 • Introduced cancel operation for Resource Parameters Set • Separated out the change/get/cancel operations in the EIS • Corrected “get” and “cancel” interfaces for resource parameter interfaces to use Request/ID=mRID instead of the payload.

  9. Comments / Questions Received Review Comments / Questions Received

  10. EIS Market Information Services Update: Background – Web Services Review • Then: External Interfaces Specification approved by TPTF in 2007 • Later: engagement with MIS and API Subgroups; Current Day Reports project changed implementation approach • New requirements were introduced (sometimes without protocol traceability) for displays; subsequently not needed as approach changed • Other reports turned out to be incompatible with web services • Issue with sizes and generating frequency of reports to be provided over API

  11. EIS Market Information Services Update: Interface Review • Total of 19 items from the Market Information section of the document (read-only interfaces) that are being removed • These are items that are not suitable to be provided via web services for various reasons • Almost all are available through other means; the four items that are not were removed due to lack of protocol traceability • Currently shown highlighted in gray in the posted version – will be deleted in final posting of v1.19

  12. EIS Market Information Services Update: Interface Review ~135 External Interfaces 51 Market Info interfaces 19 reclassified 4 not in protocols 5 ‘Get Report’ 3 other reports 7 MIS Displays • See accompanying spreadsheet for detail • ERCOT Market Information List (EMIL) located at http://nodal.ercot.com/readiness/reports/index.html under Key Documents titled “MIS - ERCOT Market Information List v8.09”

  13. Q&A Q&A

More Related