Road and Traffic Incident Management Presenters: Stefan Sanders (Senior Network Manager) Wayne Oldfield (Maintenance Contract Manager) Rotorua 17 -18 March. Introduction This presentation will cover: The history of Marlborough Roads and its approach to a one network delivery

pahana
Download Presentation

Road and Traffic Incident Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Road and Traffic Incident Management Presenters: Stefan Sanders (Senior Network Manager) Wayne Oldfield (Maintenance Contract Manager) Rotorua 17 -18 March

  2. Introduction • This presentation will cover: • The history of Marlborough Roads and its approach to a one network delivery • Maintenance and Operations review • Historical Road maintenance contracts • Network Outcomes Contact Conversion (NOC) • How incident management is delivered through the NOC • Incident Management – How well are we doing

  3. Marlborough Roads is a unique office of the New Zealand Transport Agency which manages State Highways and MDC Roads as One Network. • The network is maintained by using the new Transport Agency’s NOC • Some History: • 1989 – MDC outsourced its roading operations • 1993 – Tendered Total Maintenance Management Contracts (1st in NZ) • 1999 – NZ govt considering road reform, birth of Marlborough Roads model • 2000 – Marlborough Roads office opens • 2012 / 2013 Maintenance and Operations Review • 2013 – Marlborough Roads is the first Road Controlling Authority to convert the new NOC model

  4. The Marlborough Roads Office is a NZ Transport Agency Office.The Transport Agency have a contract with the Marlborough District Council to Manage the Districts Roading Activities. This contract is known as the Local Roads Asset Management Agreement (LRAMA)This contract includes : • Funding Assisted Roading Programme • Unsubsidised Roading Programme • Corridor Management • Transport Planning • Parking

  5. State Highway Network • 247 Km of Highways • 78 Bridges • Marlborough District Council • 874 Km of Sealed Road Network • 645 Km of Unsealed Road Network • 349 Bridges and 10 Jetties • D’Urville Island – 68km • Traffic Volumes • SH Traffic Volumes 400 – 20,000 vpd • Local Roads: • High Volume Urban 8000 – 15,000 vpd 2% of the network • 1500km < 500 vpd

  6. Marlborough Issues • Development – Urban and Rural • Forestry (excess of 2 M tonnes per annum) • Viticulture- (72% of NZ wines originates from Marlborough) 24,000 hectares of vineyard, 250,000 tonnes of grapes processed.

  7. Marlborough Issues (cont..) • Aquaculture (70% of NZ Mussels and 80% of NZ Salmon) 2,800 Hectares of marine farm in the Marlborough Sounds • Tourism (Marlborough Sounds, Wineries). • Gateway to both islands, Port Marlborough and Inter – Island Ferries • Natural Events: • Storms/flooding/snow • Earthquakes! • Huge variation in climate

  8. Understanding Our Customer Needs • It is hugely important we understand our customers needs. This is not only for delivering Levels of Service but also when it comes to dealing with incidents • Marlborough Region has a network of Ratepayers and Residents’ Groups • Marlborough Roads staff meet at least once a year with all of these groups

  9. Understanding Our Customers Needs (cont..) • Marlborough Roads staff attend the MDC Assets and Services Committee meeting • Regular consultation with local Councillors • Chamber of Commerce • Road Transport Association • Automobile Association • Police • Regular Lifelines Group Meetings and Exercises

  10. Incident Management PRE NOC • Pre NOC conversion • Marlb North and South – maintenance contracts • Professional Services contract • The consultant managed incidents with the contractor on behalf of the Marlborough Roads • Marlborough Roads main function were press and stakeholder relations

  11. M&O Review • The Transport Agency reviewed its Highways and operations staff structure to ensure successful delivery of the NOC • Subsequently significant changes were needed in how the Transport Agency would manage its future business • New roles were created: • Journey Manager: ensure state highway operations provide effective and efficient end-to-end journeys, with a specific focus on moving people and freight. • Maintenance Contract Manager: ensure a consistent delivery of the NOC • Network Managers: Corridor and Network Management

  12. Marlborough Roads Structure

  13. NOC Conversion • Marlborough Roads converted its three existing contracts • Subsequently an un incorporated JV - HEB Construction Limited and Opus International Consultants • The Emergency Procedures and Preparedness Plan: defines the roles, practices and procedures in preparation for and during an incident response event. • NOC – Incident Response Maintenance Specification section 5 and 6 • Any event such as accidents, spillages, floods, fires….. • Responding to crashes and other events • Typical works include: • Assisting police and emergency services – TM and clean up • Repairing and make safe the road assets • Removal live animals and abandoned vehicles • Slip removal

  14. Incident Management to Date: • We have managed several incidents since the conversion. • Earthquakes in July and August 2013 • Several storm events on the local road network, which resulted in twenty or so road closures and diversions • Landslips

  15. Incident Management to Date: • In August 2013 we encountered a significant earthquake magnitude 6.6 depth of 8km • The earthquake, including significant aftershocks, was centred on Lake Grassmere Roads and bridges in that area suffering significant damage. • SH 1 was closed for approximately 18hrs as a number of large slips were cleared • Bridge approaches were levelled and cracking repaired. • To compound problems heavy rain following the earthquake made emergency repairs difficult and caused additional damage, slips, surface flooding etc.

  16. Earthquake Response 16/08/2013 • Was not declared as a Civil Defence Emergency • The event was managed by the Marlborough Emergency Management Team at the MEM centre • Marlborough Emergency Management operates under the “Coordinated Incident Management Systems (CIMS)

  17. CIMS In Practice

  18. CIMS In Practice • Journey Manager based at the MEM centre communicating with Marlborough Roads team • Marlborough Roads Team co-ordinated works out in the field with the JV • Journey Manager keeping Incident Controller aware of what is happening in the field • Journey Manager briefing both the Mayor and the Highway Manager for hourly press releases