1 / 5

API Cooperative Testing Program 2013-2014

API Cooperative Testing Program 2013-2014. Hyatt on Capitol Hill Washington, DC June 25th, 2013. Program Format . December 2013 - -Solicitation Letter mailed to Committee members, monogram holders, past participants

pancho
Download Presentation

API Cooperative Testing Program 2013-2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. API Cooperative Testing Program 2013-2014 Hyatt on Capitol Hill Washington, DC June 25th, 2013

  2. Program Format • December 2013--Solicitation Letter mailed to Committee members, monogram holders, past participants • January 15, 2014– Deadline for subscribing to the 2014-2015 program • February 2014– Samples distributed by ??? • February 2014– Electronic reporting forms and testing protocol distributed by email when samples shipped • May 15, 2014– Deadline for returning results by email to Scott Saville and Bill Carruthers • June 2014– Preliminary report made at API summer meeting

  3. TESTING PROTOCOL • Schedule 5 neat • Free Fluid • Strength at 100 (8 & 24 Hr) and 140 (8 hr), UCA (8 Hr & 24 Hr) • Chemistry • Fineness • Gel • Additional Testing for strength work group • Additional other testing?

  4. Sample Weight Requirements • Schedule 5 860 grams • Free Fluid 860 grams • Strengths (4 sets) 3440 grams • Gel Strength 860 grams • Rheology 860 grams • Blaine, Chemistry, etc. 25 grams • Additional Testing ???? • TOTAL 6905 grams

  5. Volunteers from the 2010 Program • Lehigh, Edmonton, AB Canada (NM) • Dyckerhoff, Germany (M) • Raysut, Oman (M) • VOLSKCEMENT (Holcim) Russia (M) • HolcimApasco S.A. de C.V., Tabasco, Mexico (M) • TPI Polene Public, Thailand

More Related