An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dual Fuel Initiative NEPOOL TC & RC Summer Meeting July 30, 2004 – Newport, RI Mark Babula ISO New England Inc.

  2. Background • The ISO’s review of system operations during the January 2004 Cold Snap, identified the need for understanding the “true” operational capability of dual fuel generators & promote expansion of dual fuel capability • ISO has contracted with the ESS Group to: • Assess current dual fuel capability • Perform a constraints analysis • Develop expansion strategies & feasibility analysis ISO New England Inc.

  3. Scope of Work • Assessment of Current Capability • Determine dual fuel generating capacities and limitations • Consider geographic locations, seasonal limitations, and oil storage capacities • Constraints Analysis • Determine regulatory, design, and operating constraints on dual fuel operation • Assess primary drivers leading to current conditions • Expansion Strategies & Feasibility Analysis • Identify strategies that may increase dual fuel capabilities • Assess feasibility of technical, regulatory and policy alternatives • Collaborative process with State Environmental Agencies ISO New England Inc.

  4. Capability Assessment • Start with initial categorization of units using ISO-NE CELT Report • Initial classification by state and claimed fuel type • Gas Only, Oil/Gas, Oil Only, Other (coal, nuclear, renewables..) • Obtain information regarding air permits for to identify limitations • Summarize all units by state, fuel type, and permit limits • Gas Only (no oil firing allowed by permit) • Gas w/oil back-up (limited oil firing allowed by permit) • Oil only limited (annual operating limits in permit) • All other (oil w/o limits, coal, nuclear, renewables, etc.) • Initial summary of on-site oil storage capacity • Determine generating capacity with quantity stored on site ISO New England Inc.

  5. Capability Assessment – Preliminary Findings • Winter Capacity by Fuel Type: (Note: All values represent permitted capacity) • Total Capacity ~32,900 MW • Gas Only = 19% (6,300 MW) • Gas w/ oil back up = 22% (7,150 MW) • Oil only limited = 2% (550 MW) • Oil w/ Gas = 11% (3,600 MW) • Oil unlimited = 11% (3,600 MW) • All other = 35% (11,700 MW) ISO New England Inc.

  6. Capability Assessment – Preliminary Findings • Permitted Capacity - Regional Considerations (Note: All values are percent (%) and MW) STATETOTALGAS ONLYGAS W/ OIL MA 42% (13,800) 24% (3,300) 20% (2,800) CT 25% (8,200) 3% (250) 24% (2,000) NH 12% (4,150) 13% (535) 19% (800) ME 11% (3,650) 38% (1,400) 10% (350) RI 6% (2,050) 41% (850) 58% (1,200) VT 3% (1,050) 0% (0) 0% (0) ISO New England Inc.

  7. Capability Assessment – Preliminary Findings • Dual Fuel Units – Oil Firing Limitations • 4% (270MW) allowed 2,300-3,800 hours • ½ in MA, ½ in RI • 20% (1,400MW) allowed up to ~ 2mos • 80% in RI – allowed only when gas “not available” • 70% (4,800MW) allowed 30 days or less • Mostly CT and MA units • Oil use is predominantly discretionary • On-Site Oil Storage Capacity • 46% (3,016MW) have less than or about 2 days of full load oil storage on site ISO New England Inc.

  8. Capability Assessment – Next Steps • Determine actual dual fuel capacity and capability • Note difference between reported and permitted dual fuel capacity • Reported 3,000 MW Permitted 7,000 MW • What’s been installed and is operative? • What are the facility specific issues and constraints? • How much oil have dual fuel facilities historically used? ISO New England Inc.

  9. Constraints of Dual Fuel Capability • On-Site Technical Issues - Impacts on equipment - Staffing & Lead time • Delivery Dual Fuel Availability - Interruptible Supply - Low/Very Low Sulfur Distillate - Off-site Storage Capacity - Infrastructure/Transportation Economics - Heat rates & spark spread - Maintenance - Plant Modifications Air Permitting (State, Federal PSD/NSR) - Ambient Impacts - BACT/LAER Water Use - Withdrawal & Discharge Siting Boards/Councils - Resource protection issues - Transportation impacts Local Approvals & Hearings ISO New England Inc.

  10. Expansion Strategies & Feasibility Analysis • Short-Term: Increase fuel switching flexibility • Special Operating Procedure • Regional MOU under severe weather & strained capacity • Mid-Term: Increase permit limits for discretionary oil use • Long-Term: • Generation use and concerns • Engagement & Analysis of oil suppliers • Storage capacity, contracts, fleet & staff • Development of Regional Generation Rule • Banking programs, permit modification process • Diversification of Supply and Demand • Distributed generation, demand response, alternative energy sources ISO New England Inc.

  11. Expansion Strategies & Feasibility Analysis • Next Steps • Development of Policy & Implementation tools with state air regulators for Winter 2004/2005 • Assessment of generators’ use and concerns • Assessment of oil infrastructure and supply • Develop collaborative agenda and schedule ISO New England Inc.

  12. Discussion/Questions ISO New England Inc.