1 / 9

DMG Base MCS and Length Supplementary Slides

DMG Base MCS and Length Supplementary Slides. Authors:. Date: 2016-05-17. Abstract. The current text in draft D5.4 of REVmc defines the Base MCS and Length field in the PHY SC header for extended MCS.

Download Presentation

DMG Base MCS and Length Supplementary Slides

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hiroyuki Motozuka, Panasonic DMG Base MCS and LengthSupplementary Slides Authors: • Date: 2016-05-17

  2. Hiroyuki Motozuka, Panasonic Abstract • The current text in draft D5.4 of REVmc defines the Base MCS and Length field in the PHY SC header for extended MCS. • But the formula for Length field value causes duration calculation error for some Ns (number of PSDU octets.) • The submission 11-16/0670r5 proposes modified text and formulae to fix it. • This submission includes supplementary slides for 11-16/0670r5.

  3. Hiroyuki Motozuka, Panasonic Duration calculation error • Base MCS and Length field value in SC Header should be set so that the duration calculated from Header equals to the actual duration. • The formula in D5.4 causes duration errors for some Ns (numbers of octets.) • Potential risks to fairness and interoperability on IFS/backoff procedures Extended MCS capable STA sees this duration example) Actual MCS, PPDU octets MCS9.1, N = 70 actual PPDU duration = 3.09 usec Header values Base MCS6, Length=40 (according to the formula in D5.4) duration calculated from Header = 2.80 usec -0.29 usec Extended MCS non-capable STA sees this duration Observed duration errors-0.29us ~ +0.58us

  4. Hiroyuki Motozuka, Panasonic Proposed Modification – Base MCS • Base MCSs (6 to 12) are mapped to Extended MCSs in natural order.

  5. Hiroyuki Motozuka, Panasonic Proposed Modification - Length • Proposed Length formula is based on NBLKS (number of symbol blocks) • Avoid errors caused by number of parity bits used for recovery of number of data octets (N) at receivers set according to given duration

  6. Hiroyuki Motozuka, Panasonic Proposed Modification – Length(cont’d)

  7. Hiroyuki Motozuka, Panasonic Proposed Modification - SI • Similar to 11-16/0220r3, two bits out of SI field are used for recovery of the actual number of octets at receiver STA. • Formula is as follows: =

  8. Hiroyuki Motozuka, Panasonic Verification • Duration error is eliminated with proposed formula. • Recovery of the number of data octets works. • We verified it throughout: MCS {9.1, 12.1, 12.2, 12.3, 12.4, 12.5, 12.6} x Number of octets: 1-262143 example) Actual MCS, PPDU octets MCS9.1, N = 70 actual PPDU duration = 3.09 usec Header values Base MCS6, Length=68 duration calculated from Header = 3.09 usec Observed duration error0 usec

  9. Hiroyuki Motozuka, Panasonic References • [1] Draft P802.11REVmc_D5.3 • [2] 11-16/0220r3 Clause 20 SC MCS Extension • [3] 11-16/0233r0 Additional SC MCSs in clause 20 (DMG PHY) • [4] 11-16/0670r5 Base MCS and Length Calculation for Extended MCS Set

More Related