Electrical High-speed Serial Interconnects (e-HSSI)

Electrical High-speed Serial Interconnects (e-HSSI). PH-ESE working group Kickoff meeting. Introduction. Why ?. High-speed serial links are replacing parallel buses PCBs, backplanes, cables between modules etc.

pello
Download Presentation

Electrical High-speed Serial Interconnects (e-HSSI)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electrical High-speed Serial Interconnects (e-HSSI) PH-ESE working group Kickoff meeting

  2. Introduction

  3. Why ? • High-speed serial links are replacing parallel buses • PCBs, backplanes, cables between modules etc. • bit rate on these links increases rapidly, approaching the fundamental limits of the transmission media • Programmable logic devices (FPGAs) support high-speed interfaces • DDR2, DDR3, QDR etc. • Boards usually contain several, high-pin-count devices • Board layout becomes very complex We need to gain experience in the domain

  4. How? • Find experts and group them to share know-how • Identify tools and tool chains • Define methodologies and policies • Design • Simulation • Layout • Testing • Establish connections with other groups (e.g. EN-ICE-DEM), and external companies (chip and tool vendors) • Train people • Seminars, tutorials, application notes …

  5. Discussion Topics

  6. Design tools • Appropriate tools are required • Simulation tools (3D, 2.5D, 2D ?) • ADS, Allegro PCB SI, AWR MWO, CST MWS, HFSS, Hyperlynx, StatEye • Other ? • New tools (if any) should be compatible with existing tools • Gather experience and ensure mid-term support • At least for projects in PH-ESE

  7. Design flow • Tool selection has strong impact on the design flow Db Policy Schematic Schematic Models Constraints Layout Db Simulation(and Layout) Simulation Layout Production Design check Testing Production Testing

  8. Methodology • 3-D simulation of critical structures • Traces, via structures, power planes, connectors, packages etc. • Model extraction (S parameters) • Simulation of complete channels • Combination of the above structures • Simulation of complete boards • Is it feasible ?

  9. Test and verification • Model verification • PCB materials, IC drivers etc. • How do we get them ? • Define test methods • Testing may require special tools and solutions • Design for testability • Signal probing – impact on the layout design • Built-in testing – use inherent advantage of FPGAs

  10. Tasks • Evaluate and propose new tools • Advantages vs. disadvantages • Connection with existing CAE tools (e.g. Cadence) • Share the experience • Workinggroup meetings, SharePoint (or other) • Document: recommendations, policies etc. • EDMS

  11. Proof of Concept • Propose a pilot project • Should be simple, but useful • Ideas ? • Demonstrate the design flow • From schematics, through simulation, to production • Use the board to validate the concept • Compare the measurement results with simulation

  12. Next steps • TBD