1 / 9

20-YEAR MASTER FACILITY PLAN

20-YEAR MASTER FACILITY PLAN. BACKGROUND. OVERALL PURPOSE. ACTIVITIES. GENE’S PERFORM GOAL. POST ADD’L “SYSTEMS”. SCHEDULE REPAIR, REPLACEMENT, RETROFIT & REMODEL OF EXISTING SYSTEMS/SUB-SYSTEMS & CONSTRUCTION OF NEW. BRNSTRM “10-MOST”. STU ACHIEVE RESEARCH. DESIGN IDEAL SPACE.

penha
Download Presentation

20-YEAR MASTER FACILITY PLAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 20-YEAR MASTER FACILITY PLAN BACKGROUND OVERALL PURPOSE ACTIVITIES GENE’S PERFORM GOAL POST ADD’L “SYSTEMS” SCHEDULE REPAIR, REPLACEMENT, RETROFIT & REMODEL OF EXISTING SYSTEMS/SUB-SYSTEMS & CONSTRUCTION OF NEW BRNSTRM “10-MOST” STU ACHIEVE RESEARCH DESIGN IDEAL SPACE PRPRTY VALUATION RSCH BRNSTRM NEW/UPGRADES SCHOOL CONST GRNT TODAY’S PURPOSE SORT BY ACH/VALN/SVGS ECONOMY; LOCAL STIMULUS? REVIEW/ADD MTG 1 LIST ANN’L H-L-S REQUIRE ID “WANTS”/”NEEDS” DECENNIAL RE-SURVEY ASSIGN “ADDED” VALUE DIST STRATEGIC PLAN HMWRK: SUBSTN ADD VAL LIMITED RESOURCES “GREEN” REVOLUTION TOMORROW’S PURPOSE NON – PURPOSE AVOID SPEND’G $’s TWICE REVIEW LISTS/SORTS CUSTD’L/MAIN’T ISSUES PRIORITIZE RECENT CONSTRUCTION MESH W/ ARCHT WRK

  2. Goal

  3. Objectives

  4. Evaluation

  5. Definitions • System: a “structural unit” or “piece(s) of equipment” or “parts which when assembled/combined together make up a functional ‘whole’” • Subsystem: a component of a larger system; a compressor in an HVAC system, for example • Space: any field or floored-walled-covered area that supports a function; Coincidentally, an individual space can also be viewed as a “subsystem” and by extension a combination of spaces viewed as a “system”

  6. Brainstorming Activity #1

  7. ID “WANTS” / “NEEDS” Classroom, Gym, Office, Auditorium, Restroom, Entryway, Hallway, Cafeteria • Design your ‘ideal’ [ ____ ] environment … ... describe how it might ‘look,’ ‘feel,’ ‘sound,’ and ‘function’ … … tells us about ‘floors,’ ‘walls,’ ‘ceilings,’ ‘amenities,’ ‘equipment,’ etc. … draw a picture

  8. ID “WANTS” / “NEEDS” • 10-most often heard complaints? … about a classroom … about an auditorium … about a gymnasium … about a restroom … about a hallway/entryway … about an office

  9. ID “WANTS” / “NEEDS” • What do we ‘want’ / ‘need’ that we do not currently enjoy? … new items … upgrades to existing items … other improvements

More Related