1 / 3

Pitot Static Training

Pitot Static Training. First Line Maintenance. P/S Testing Precautions. 1. Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious way 2. Ensure static heat switch off if equipped and as above

peyton
Download Presentation

Pitot Static Training

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pitot Static Training First Line Maintenance

  2. P/S Testing Precautions • 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious way • 2. Ensure static heat switch off if equipped and as above • 3. Ensure drains are identified and ensure are in closed position, perhaps open drains and inspect for water • 4. Fit pitot adapter to pitot head and tape off and flag drain holes • Fit static adapter to side of a/c if fixture is available; with some a/c it is acceptable to tap into drain fitting.- Inspect static parts at this time for deformation / corrosion. Tape off and flag any unused static ports.

More Related