80 likes | 164 Views
TRD Ride Along Bottle. Ground Safety Review – Phase III February 22-24, 2010 Phil Mott. The ride along bottle keeps the TRD straws slightly above 1 atm to prevent them from possibly collapsing under a negative pressure. (mission success) Standard off-the-shelf Luxfer Gas Cylinder
E N D
TRD Ride Along Bottle Ground Safety Review – Phase III February 22-24, 2010 Phil Mott AMS-02 GSR Phase III
The ride along bottle keeps the TRD straws slightly above 1 atm to prevent them from possibly collapsing under a negative pressure. (mission success) Standard off-the-shelf Luxfer Gas Cylinder MDP = 200 Bar Test = 300 Bar Material = Al 6061-T6 Weight = 24.5 lbs empty All hardware will be removed in the SSPF prior to AMS installation into the canister. All hardware will be reinstalled at the pad IF launch abort or hurricane rollback. All hardware uses captive fasteners. Overview AMS-02 GSR Phase III
AMS-02 in Pad Orientation SFHe Fill Port Sill Trunnion Sill Trunnion Zenith Radiator TRD Ride Along Bottle Y X Sill Trunnion Sill Trunnion AMS-02 GSR Phase III
Sill Trunnion Radiator Sill Beam TRD Ride Along Bottle Sill Trunnion AMS-02 GSR Phase III