1 / 48

TRD Status Report

TRD Status Report. Johannes P. Wessels – GSI Darmstadt. general status full scale prototype production radiator readout chamber integration issues results from test beams gas system electronics analog – pre-amplifier shaper digital – ADC development, tracklet processor

phiala
Download Presentation

TRD Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRD Status Report Johannes P. Wessels – GSI Darmstadt • general status • full scale prototype production • radiator • readout chamber • integration issues • results from test beams • gas system • electronics • analog – pre-amplifier shaper • digital – ADC development, tracklet processor • system integration – MCM, readout boards • power • detector control system • simulations • environment • trigger performance, tracking • testbeam schedule • milestones

  2. General status • September `01 - technical design report submitted • November `01 – presented to the LHCC • January `02 – recommended for approval by LHCC • February `02 – approved by Research Board • because of the funding situation -> recommendation to build `short asymmetric´version (about 58%) Actively seeking funds at the moment; Japanese have expressed interest to join the project and are in the process of requesting support.

  3. Chamber design pad plane with HEXCELL/CF backing amplification region drift region radiator

  4. First pad plane support • Polish manufacturer (LHCb) • bottom side: flatness better than 100 microns • top side: flatness better than 300 microns • tolerances well within needs

  5. First pad planes • size of ordered pieces: 1200 x 512 mm2 (200 µm thickness) • need 3-4 pieces/chamber depending on length of chamber • manufactured by OPTIPRINT, Switzerland • still problems with handling

  6. Bending of pad plane support • sandwich with aluminum frame taped to flat table • measurement of deflection of center and sides as function of overpressure • sandwich deforms exactly as calculated using a simple model for sandwich structures • maximum bending with respect to anode wires <220microns

  7. Expected gas gain variation • gain varies linearly with bending of pad plane • for the maximum tolerated overpressure in the chamber about 15% gain variation is expected • additional wire sag not important for a large range in cathode wire tension

  8. Radiator • CF-laminated `quilt´ structure of: • 100 micron CF laminate • Rohacell HF71 • polypropylene fibers from Freudenberg LRP375BK • optimization of ROHACELL vs fiber thickness ongoing • have option to buy stock retained for Aachen for prototype developments • full production for ALICE TRD will be 80k€

  9. Material for prototypes • goal is to build fully functional prototypes • Polish CFK/HF71 (8mm) and 7 layers LRP375BK - radiator finished including electrode - now testing for wire load and overpressure • AIK CFK/HF71 (8/6 mm) 7/8 layers LRP375BK - CFK on hand, fibers arrive by mid-April • Polish CFK/HF71 (6mm) with 8 layers LRP375BK - need to purchase raw materials and place order Polish manufacturer provides thinner, smoother, and cheaper laminate – BUT sole supplier issue

  10. Radiator detail • 8mm ROHACELL HF71 coated with ~ 100 micron CF covered mith Al-Mylar • partially filled with Freudenberg fibers LRP375BK (ATLAS)

  11. Full size radiator laminated material purchased – radiator assembly by Muenster group

  12. Detail during chamber assembly assembly of first full scale prototype done in Heidelberg

  13. Full scale prototype largest chamber: 1200 x 1600 mm

  14. Winding machine • machine currently under test at GSI • tensioning mechanism conditioned • full-size transfer frames delivered • will be moved to Heidelberg in April

  15. Influence of wire tension on frames

  16. Influence of wire tension on frames • deformation of sides about 130µm each • corresponds to maximum relaxation of wire tension by 13% red line denotes load according to TDR

  17. Gas feed-through - design 2 feed throughs per chamber 10 chambers per circuit pressure drop for 10 chambers < 0.05 mbar

  18. Gas feed-through • leakage has been tested • with small prototypes • misalignment of chambers • was pushed to 4 degrees • between faces • at 10l/h flow and 10ppm oxygen -> full TRD would loose 0.027l/h due to seals (TDR < 0.5l/h) • approx. 1000 CHF/yr

  19. Integration into space frame

  20. Revised super module design

  21. Rollers • rollers now attached to L-profiles welded to space frame • reduces space necessary for support • increases stiffness of thin supermodules • same gadgets needed on installation tool

  22. Results from 2001 testbeam • resolution of the `good´ xenon - `bad´ xenon story • momentum scan to evaluate pion rejection for various compositions of radiator materials • position resolution and angular resolution for tracking

  23. Testbeam setup

  24. TRD signals: pions, electrons

  25. Good Xenon – Bad Xenon • different bottles of Xe show very different average pulse height distributions in drift region • finally managed to resolve this long-standing problem • traced to minuscule contaminations of VERY electronegative components • <0.1ppm CF4 • 0.08ppm C2F6 • 0.8ppm O2 • 0.68ppm SF6 (!) • suppliers now aware of this

  26. Status of gas system • test system with purification and recuperation operational • molecular sieves retain CO2 • because of small volumes used so far, recuperation only performed off-line • test system modified; now includes buffer vessel for regulating small volumes (compressor can handle full detector -> 27m3) • system including recuperation will be used in the stack test in Fall 2002

  27. Pion efficiency • CERN measurements scaled to reproduce GSI data at 1 GeV/c for identical radiator • pion sample still contains some (soft?) electrons (next slide) • pion rejection shown to not deteriorate for higher momenta • thick carbon fiber laminate 300 microns decreases rejection by factor 2-3. Still at 1% in relevant momentum range • new production uses only about 100 microns

  28. Electron pion spectra Data (CERN T10 + GSI) Simulation + Data - GSI

  29. Local track reconstruction

  30. Tracking resolution • ALICE operational point at S/N = 30-40 • difference in angular resolution is an artifact due to slightly different length of the drift region in the two test chambers

  31. Tracking resolution (B-field) • test setup at GSI with large coils • soft delta electrons curl up in magnetic field • improved point and angular resolution

  32. Lorentz angle for Xenon • exact knowledge of Lorentz angle necessary for precise track reconstruction • data in literature not consistent • within limits posed by the precise knowledge of the CO2 content values agree with MAGBOLTZ

  33. TRD electronics chain

  34. Preamplifier status • 3rd chip submitted end of January • expected back end of March • possibly last iteration • increased size due to fully differential design

  35. Footprint of preamplifier • 18 fourth order pre-amp shapers with differential outputs (21) • external references to adjust to range of ADCs • digital test structure for chip verification • size of chip: 3030 µm x 7280 µm

  36. Evaluation of PASA • complete evaluation prepared; chip expected back in two weeks • some results from simulations • full signal in center channel • 50% signal in adjacent pads -> produces cross talk on <10-5 level in neighboring channels • full corner analysis • only small yield expected outside specifications (mainly leading to too short shaping time) • gain variations tolerable

  37. Digital chip - recent changes & developments • Conceptual Design Review conducted in early January • complete design now for 0.18µm UMC process • tail cancellation network now baseline design • link width reduced to D8+P+Spare double data rate • giving up on dynamic error correction (Hamming) • implementation of one spare signal allowing to multiplex out stuck bits (maximum 2 per link) • readout tree simplified • configuration tree fully operable in FPGAs (2 nodes tested; currently implementing Linux interface) • MIMD CPU (1 node) operable in FPGA • FPGA CPU boots UCLinux for Slow Control • LVDS Rx and Tx implement power down mode now (wake-up time ~500 ps) • use of ALTRO chip as 16-channel ADC from TPC (test/fall back)

  38. ADC – Univ. Kaiserslautern Parameter Value Sampling Rate 10 MSpS Resolution 10 Bits Power Consumption 5 mW Max. INL 1 LSB Input signal BW 5 MHz Diff. Input Range +/- 1V Chip Area 0.2 mm² Converter Principle cyclic

  39. S S S S N N N N N N N N N N G V T T T T G V G V G V G V G V G V E E E E I I I I I I I I I I N C C M D D N C N C N C N C N C N C R R R R _ _ _ _ _ _ _ _ _ _ D C K S I O D C D C D C D C D C D C 0 0 0 0 P P P P P P P P P P _ _ _ _ 0 0 0 0 0 0 0 0 0 0 D D D D _ _ _ _ _ _ _ _ _ _ O O I I P P S S C C D D D D U U N N R R T T T T 9 9 8 8 - + - + - + T T E E R R R R - + o o B B L L - + - + - + N N N O R N N S S S S N N N N N N N N N N N N N N N N N N N N U E E E E I I I I I I I I I I I I I I I I I I C C C S C C C C T R R R R _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ T _ 1 1 1 1 P P P P P P P P P P P P P P P P P P _ R _ _ _ _ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 n D D D D _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ N G O O P P S S C C I I D D D D D D D D D D D D N N 9 9 8 8 7 7 6 6 5 5 7 7 U U R R T T T T T T - + E E R R R R - + - + - + - + - + - + - + o o B B L L - + - + - + VCC GND NI_P0_ D5+ NI_P0_ D5- VCC GND NI_P0_ D4+ NI_P0_ D4- VCC GND NI_P0_ D3+ VCC PLL_LOC KED NI_P0_ D3- GND PLL_RE SET VCC CLK_PLL _IN SEL_C LK GND CLK_PLL _IN PA_SS TR NI_P0_ D2+ VCC PA_SC LK NI_P0_ D2- GND PA_SD AT NI_P0_ D1+ ADCM0 _D9 ADCM0 _D8 NI_P0_ D1- ADCM0 _D7 ADCM0 _D6 VCC ADCM0 _D5 ADCM0 _D4 GND ADCM0 _D3 ADCM0 _D2 NI_P0_ D0+ VCC ADCM0 _D1 NI_P0_ D0- ADC_C LK ADCM0 _D0 VCC GND ADCM2 _D0 GND ADCM2 _D1 ADCM2 _D2 NI_P0_C LKo+ ADCM2 _D3 ADCM2 _D4 NI_P0_C LKo- ADCM2 _D5 ADCM2 _D6 VCC ADCM2 _D7 ADCM2 _D8 GND VCC ADCM2 _D9 NI_P4_C LKi+ GND ADCM3 _D8 NI_P4_C LKi- ADCM3 _D9 ADCM3 _D6 VCC ADCM3 _D7 ADCM3 _D4 GND ADCM3 _D5 ADCM3 _D2 NI_P4_ D0+ ADCM3 _D3 ADCM3 _D1 NI_P4_ D0- VCC ADCM3 _D0 VCC GND ADCM1 _D0 GND ADCM1 _D1 ADCM1 _D2 NI_P4_ D1+ ADCM1 _D3 ADCM1 _D4 NI_P4_ D1- ADCM1 _D5 ADCM1 _D6 VCC ADCM1 _D7 GND VCC GND ADC_S EL0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C I I I I I I I I I I I I I I I I I I I I I I I I I I C I I C I I C I I I I C _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ P P S S C C C C C C D D D D D D D D D D D D D D D D D D D D D D D D 9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 0 0 0 0 1 1 R R T T T T L L L L E E R R R R - + - + - + - + - + - + - + - + - + - + K K K K - + - + o o B B L L o o o o - + - + - + - + - + G V N N N N G V N N G V N N G V N N N N G V N N G V N N N N G V N N G V N N G V N C I I I I N C I I N C I I N C I I I I N C I I N C I I I I N C I I N C I I N C D C _ _ _ _ D C _ _ D C _ _ D C _ _ _ _ D C _ _ D C _ _ _ _ D C _ _ D C _ _ D C P P P P P P P P P P P P P P P P P P P P P P 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ P P S S C C D D D D D D D D D D D D D D D D R R T T T T 9 9 8 8 7 7 6 6 5 5 4 4 3 3 2 2 - + - + - + - + - + - + - + - + E E R R R R i i B B L L - + - + - + PAD layout of TRAP1 chip A DC P LL NI_P0_ D6+ Input port NI_P0_ D6- NI_P1_ D4+ EAST NI_P1_ D4- NI_P1_ D3+ NI_P1_ D3- NI_P1_ D2+ NI_P1_ D2- Input port NI_P1_ D1+ NI_P1_ D1- H NI_P1_ D0+ NI_P1_ D0- NC T NI_P1_C LKo+ NI_P1_C LKo- U NC H NI_P2_P REo+ NI_P2_P REo- O NI_P2_S TRB+ T NI_P2_S TRB- S NI_P2_C TRL+ NI_P2_C TRL- R NI_P2_ D9+ Input port NI_P2_ D9- O NI_P2_ D8+ NI_P2_ D8- NI_P2_ D7+ N NI_P2_ D7- NI_P2_ D6+ NI_P2_ D6- NI_P2_ D5+ NI_P2_ D5- NI_P2_ D4+ NI_P2_ D4- NI_P2_ D3+ NI_P2_ D3- NI_P2_ D2+ NI_P2_ D2- NC ADCM1 _D8 ADCM1 _D9 WEST ADC_S EL1 • total area 25mm2 • 32 power/GND pads • merger MCMs require only single pad ring Input port Output port

  40. MIMD Processor screen shot of full layout of MIMD processor

  41. MCM footprint • contains 18ch preamp 21 ADCs (ALTRO) tracklet processor controls • BGA432 package • 432 pins (4 rows, 31 pads) • grid 1.27mm x 1.27 mm • dimensions roughly 40x40 mm2 • few external components

  42. LVDS design of readout board

  43. Status of simulation software • geometry follows latest design • detailed geometry of MCMs and cooling included • supermodule support structure included; rails, services soon to come • hit compression from TPC included • tilted pad option included • adapted pad response functions • time response function included • digital filter tail cancellation included MCM detail

  44. Detail of simulated geometry

  45. New digits display available allows to superimpose digits from different events

  46. Tracking • trigger performance now checked for tilted pads • fast simulations -> parameterization of response will done • global tracking strategy for all detectors IST, TPC, TRD now using Kalman filter • still some problems with tilted pads • for electrons special treatment of Bremsstrahlung needs to be implemented • electron identification and pion rejection using transition radiation and dE/dx signals need to be provided for electron tracking strategy

  47. Future use of testbeams • 2002 – 12 days (performance) • stack test (at least three layers) • momentum dependence of pion rejection • final preamp and tracklet processor on MCM • final gas system • cooling and DCS test systems • 2004 – 8 days (1/2 calibration, 1/2 quality assurance) • several full stack tests • high statistics measurement of pion and electron spectra up to highest momenta (6 GeV/c) • test of global tracking unit (GTU) • test of calibration scheme • 2003 – 9 days (1/3 performance, 2/3 quality assurance) • full stack test – multi-hit capability • trigger performance evaluation • test of readout system • check of cooling and DCS systems • 2005 – 7 days (calibration) • calibration of several stacks including full momentum scan • commissioning of GTU

  48. Milestones • 12-01: digital chip engineering design review • done in January; concept considered appropriate yet challenging; some suggestions already incorporated for submission • 01-02: 3rd MPW run submission of PASA • date has been met, chips expected back in about two weeks • 04-02: 1st submission of digital chip TRAP1 • actual submission date will be April, 17; contains track let processor, 3 ADCs, configuration tree, separate inputs for use with external ADCs • 05-02: engineering design review of chamber design • foreseen for end of May; date can be met if all pending tests go well Dates for production milestones will need to be revisited if change in overall schedule will be announced

More Related