An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Time Meeting: Agenda • Safety • Setup Status and Schedule • RHIC and Experiments Reports • Machine and Systems Reports • AOB

  2. Safety • Take 5 for Safety…………..Ed Lessard • Clarification of PPE Policy

  3. Setup Schedule • RHIC Schedule set for Nov 1 Start-Up From: "Vigdor, Steven" <vigdor@bnl.gov>Date: October 5, 2007 12:11:58 PM EDTSubject: RHIC run startup Based on the information I have available right now, I have decided that we should proceed with the November 1 startup of the RHIC FY08 run… It is clear that if the CR situation is resolved, the Nov. 1 startup minimizes the total cost of a 30-cryoweek run, as it avoids a November period with non-productive time initiated by a startup delay, and it avoids the considerably greater power costs projected for June 2008.  This gives us greater flexibility, in the case of a suitable budget, to meet other commitments in addition to the run. It appears possible to find a way to run into the month of March with a Nov. 1 startup, under CR. If Congress has not passed FY08 budgets by March, it may well be that all of FY08 will be handled by a CR. We will simply have to keep a close eye on the funding situation as the run progresses, and remain flexible about the timing of a changeover between d+Au and p+p.

  4. Since we last met: • Dry Run 08 underway Oct 9-11. • Work underway on Polarimeter Targets and Drive Mechanism in RHIC Blue Ring. • Booster Transformer Switch work requested by LIPA for Saturday 27 Oct.

  5. RHIC and Experiments Reports • RHIC………………………….…….Kip Gardner • STAR......................................Bill Christie • PHENIX.................................Mike Leitch • Polarimeter…………………….Haixin Huang • MonoPole….............Vasily Dzhordzhadze • NSRL....................................Adam Rusek • BLIP…………………….…..Leonard Mausner • APEX......................................Fulvia Pilat

  6. Machine Reports • Operations……………...Peter Ingrassia • Sources...............................Jim Alessi • Linac and Tandem...............Jim Alessi • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Beam Lines…………………..Al Pendzick • Beam Comp/Instrum..……..Tom Russo

  7. Systems Reports • Cryogenics.............Andy Warkentien • Vacuum..........................Mike Mapes • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF…………………………...Tom Throwe