Project Name

Project Logo or Icon, if desired. Project Name. On-going Quarterly Review Date. Agenda. Introduction/Comments Project Overview Open Items from Prior Review Project Status Product Status Issues/Risks Project unique agenda topics Next Steps. Open Items from Prior Review.

pooky
Download Presentation

Project Name

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Logo or Icon, if desired Project Name On-going Quarterly Review Date Project Name

  2. Agenda • Introduction/Comments • Project Overview • Open Items from Prior Review • Project Status • Product Status • Issues/Risks • Project unique agenda topics • Next Steps Project Name

  3. Open Items from Prior Review Project Name

  4. Project Status Project Name

  5. February March April May June ID Task Name 1/21 1/28 2/4 2/11 2/18 2/25 3/4 3/11 3/18 3/25 4/1 4/8 4/15 4/22 4/29 5/6 5/13 5/20 5/27 6/3 6/10 1 Planning Phase 2 Planning Phase 2/1 2/28 3 Design Phase 4 Design Plan 3/1 4/2 5 Traceability Matrix 3/26 4/30 6 Updated Project Plan 4/27 4/30 7 Construction Phase 8 Construction Activities 5/1 5/31 9 Implementation Phase 10 Implementation Activities 6/1 Project Schedule/Decision Points Rescheduled Task Baseline Task Completed Task Project Name

  6. Status of Implementation Use a format compatible with the project to present the Status of Implementation and Migration Schedule and Locations. Samples are provided in the Sample.ppt file. Project Name

  7. Project Deliverables Project Name

  8. Planned Vs. Actual Cost Project Name

  9. Earned Value Refresh As of: (indicate major checkpoint here) (replace bullet points with an S-curve diagram; see Figure 10-2 PMBOK) • Cumulative project cost • Actual • Cumulative Planned Value • Original • Cumulative Earned Value • Actual Project Name

  10. Product Status Project Name

  11. Performance Measures Project Name

  12. Requirements Changes • How many changes received • How many accepted • How many rejected • How many on hold • Impacts Project Name

  13. Concerns/Issues Requiring Attention Project Name

  14. Risk/Issues Project Name

  15. Project Unique Topics • Insert slides unique to the project at this point in the presentation. • The format of the project unique slides are determined by the presenter. Project Name

  16. Next Steps Project Name

  17. Task Stage Name Status Finish Explanation (Required) 1 Planning Stage Green Aug 30 01 Completed 13 Reg. Def. Stage Yellow Nov 1 01 Key resource has been out ill. 31 Design Stage Red Jan 01 02 Project funding is not sufficient. 62 Programming Stage Mar 01 02 84 Integration and Testing Apr 01 02 95 Install. & Accept. Stage May 01 02 Overview of Project Status Legend: Green = On schedule, or completed Yellow = Symptoms of, or actual problems exist, or re-baselining required Red = Date/Schedule has not been, or cannot be met = Current project stage Project Name