JAN – MARCH – ITRS TABLES DRAFTS PREPARED

2011 ITRS SCHEDULE. JAN – MARCH – ITRS TABLES DRAFTS PREPARED ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult Challenges, Technology Requirements tables, and other tables to prepare for Spring workshop APRIL – ITRS SPRING WORKSHOP IN POTSDAM, GERMANY

prisca
Download Presentation

JAN – MARCH – ITRS TABLES DRAFTS PREPARED

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 ITRS SCHEDULE • JAN – MARCH – ITRS TABLES DRAFTS PREPARED • ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult Challenges, Technology Requirements tables, and other tables to prepare for Spring workshop • APRIL – ITRS SPRING WORKSHOP IN POTSDAM, GERMANY • April 10-12, 2011 -- IRC AND ITWG Workshop • April 13, 2011 -- More than Moore Workshop • OBJECTIVE OF SPRING WORKSHOP MEETING: • ITWGS have all draft tables completed to share with the other working groups for input and consensus • PREPARE AND BRING YOUR ITWG FIRST DRAFT TABLES TO THE SPRING MEETING ! • MAY AND JUNE – ITRS FIGURES PREPARED, CHAPTER WRITING IS UNDERWAY • ITWGs work on Potential Solutions to match the Technology Requirements tables • ITWGS begin writing/editing draft chapter • Prepare for Summer workshop and to finalize all tables and charts 2011 ITRS Revision Guidelines

  2. 2011 ITRS SCHEDULE • JULY – 2011 ITRS SUMMER WORKSHOP AND SUMMER PUBLIC CONFERENCE IN SAN FRANCISCO CALIFORNIA • July 11-12, 2011 -- IRC AND ITWG Workshop • July 13, 2011 – ITRS Summer Public Conference • OBJECTIVE OF MEETING: FINAL DRAFTS OF TABLES AND FIGURES COMPLETED FOR MEETING • ITWGs present at the conference for audience and other ITWG feedback. • FIRST Drafts of chapters are underway. • AUGUST 1 – FINAL DRAFTS OF TABLES’ AND FIGURES’ FILES [EXCEL AND POWERPOINT] DUE TO ITRS EDITOR • Global input from July meeting is completed by this date! • All tables / charts / figures sent to editor as final drafts and global feedback finished for the ITWG authors to finish by September 15.  • AUGUST 15 – FINAL DRAFT [WORD DOCUMENT FILE] OF CHAPTER WRITING DUE TO ITRS EDITOR.  • This step allows checking the progress of each team. • If there are any questions with the chapter, it is early enough to fix before the freeze date of September 15. 2011 ITRS Revision Guidelines

  3. 2011 ITRS SCHEDULE • SEPTEMBER 15 – FREEZE DATE FOR ALL MATERIALS! • THIS IS A VERY IMPORTANT DATE FOR ALL ITWGs. • NOTE ! All chapter reviews and feedback by ALL Global Regions should be completed BEFORE this date, by August 1, in time for the ITWG authors to finish by September 15.  • Final acknowledgments and 1 page summary of "What's New" due for 2011 Executive Summary. • Future Fab International article due September 20, 2011 [details provided by FFI editors] • OCTOBER and NOVEMBER 2011 – IRC REVIEWS AND FINAL EDIT CYCLES • DECEMBER 2011– RELEASE 2011 ITRS, SEOUL KOREA • December 12-13, 2011 -- IRC AND ITWG Workshop • December 14, 2011 – ITRS Winter Public Conference, Seoul Korea VERY IMPORTANT NOTES ON SEPTEMBER 15 DUE DATE  TO ENSURE YOUR UPDATES ARE PUBLISHED IN 2011  No Group Reviews or Input after September 15! If FINAL material is NOT received on September 15, it will NOT post until end of 2012! 2011 ITRS Revision Guidelines

  4. 2011 ITRS DATESSNAP SHOT • JAN – MARCH – ITRS TABLES DRAFTS PREPARED • APRIL – ITRS SPRING WORKSHOP IN POTSDAM, GERMANYApril 10-12, 2011 – IRC AND ITWG WorkshopApril 13, 2011 – More than Moore Workshop • MAY AND JUNE – ITRS FIGURES PREPARED, CHAPTER WRITING IS UNDERWAY • JULY – 2011 ITRS SUMMER WORKSHOP AND SUMMER PUBLIC CONFERENCE IN SAN FRANCISCO CALIFORNIAJuly 11-12, 2011 – IRC AND ITWG WorkshopJuly 13, 2011 – ITRS Summer Public Conference • AUGUST 1 – FINAL DRAFTS OF TABLES’ AND FIGURES’ FILES [EXCEL AND POWERPOINT] DUE TO ITRS EDITOR • Global input from July meeting is completed by this date! •  AUGUST 15 – FINAL DRAFT [WORD DOCUMENT FILE] OF CHAPTER WRITING DUE TO ITRS EDITOR.  • SEPTEMBER 15 – FREEZE DATE FOR ALL MATERIALS! • OCTOBER and NOVEMBER 2011 – IRC REVIEWS AND FINAL EDIT CYCLES • DECEMBER 2011– RELEASE 2011 ITRS, SEOUL KOREADecember 12-13, 2011 – IRC AND ITWG WorkshopDecember 14, 2011 – ITRS Winter Public Conference, Seoul Korea 2011 ITRS Revision Guidelines