1 / 13

NHM MUMBAI INFRASTRUCTURE DEVELOPMENT WING

NHM MUMBAI INFRASTRUCTURE DEVELOPMENT WING. New Construction works 2007-08 to 2013-14. Repairs and Renovation Works 2007-08 to 2013-14. PWD Deposit Works. Construction of Special Units :- Green Building :- Construction of PHC at Tadasona,Dist Beed .

purity
Download Presentation

NHM MUMBAI INFRASTRUCTURE DEVELOPMENT WING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NHM MUMBAIINFRASTRUCTURE DEVELOPMENT WING

  2. New Construction works 2007-08 to 2013-14

  3. Repairs and Renovation Works 2007-08 to 2013-14

  4. PWD Deposit Works

  5. Construction of Special Units :- • Green Building :- Construction of PHC at Tadasona,DistBeed. • Fabricated Sub Centers in Tal. Dhadgaon, Dist.Nandurbar :- • • Bamni • Zapi • • Kundya • Tinasmal • • Astamba • Asarli Constructionof SNCU:- Construction of Dialysis Units:- • Raigad • Nandurbar • Ahmednagar • Beed • Nanded • Buldhana

  6. IMPORTANT PROPOSALS •MASTER PLANS FOR ALL HEALTH INSTITUTION CAMPUS •STANDARD RCC DESIGNS FOR ALL TYPE PLANS •ALL WORKS ARE TO BE DONE BY IDW •TESTING EQUIPMENTS AT DISTRICT LEVEL

  7. Guidelines for execution of civil works ` • All new constructions of Health Institutes like PHCs, SCs, RHs, SDHs & Staff Quarters are to carried out as per New Type Plans sanctioned by Government of Maharashtra. • In all new constructions, care shall be taken to ensure that the locations of these facilities are such that beneficiary households can access them easily. • In all new constructions, care shall be taken that the facility is mentioned in approved Master plan of the district. • All new constructions shall require prior approval of GOI if any shift is proposed. (No shift from backward and inaccessible areas shall be allowed.)

  8. 5. All civil works undertaken to achieve IPHS standards would be based on expected patient load and priority shall be accorded to backward and inaccessible /remote areas. 6. The state shall setup implementation arrangement to monitor quality of works and completion as per schedule. 7. Every activity is identified by its own FMR Code Number. The activity wise expenditure shall be controlled and reported to GOI against these FMR Codes.

  9. Thank You !!!

More Related