1 / 11

Welcome at CERN and Practical information

Welcome at CERN and Practical information. POCPA workshop. Jean-Paul Burnet. 14-16 June 2010. Introduction to CERN. Founded in 1954 by 12 countries Today: 20 member states 1000 MCHF / Year budget 2250 staff (physicists, engineers, technicians, …)

quant
Download Presentation

Welcome at CERN and Practical information

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome at CERNandPractical information POCPA workshop Jean-Paul Burnet 14-16 June 2010

  2. Introduction to CERN Founded in 1954 by 12 countries Today: 20 member states 1000 MCHF / Year budget • 2250 staff (physicists, engineers, technicians, …) • 6500 visiting scientists (half of the world's particle physicists) • They come from 500 universities representing 80 nationalities. • 9000 people on CERN site everyday!

  3. Introduction to CERN LHC first ramp to 1.08 TeV 29/11/2009 LHC first physics 30/03/2010

  4. Where are we with LHC? • The machine is now working very well • at 3.5 TeV per beam (nominal 7 TeV) • with a di/dt at 2A/s (nominal 10 A/s) • Beam commissioning • beam 2.1010 protons per bunch up to 13 bunches (over 2808) • intensity up to 1011 protons per bunch (1,7.1011 nominal) • squeeze (β*)up to 0.55m, working at 2m • LHC plan • LHC will run up to end of 2011 • target for the integrated luminosities 1fb-1 end of 2011 • 2012 will be a large shut down for LHC consolidation (splices,…)

  5. Progress with beam

  6. Introduction to TE/EPC • The Group is responsible for all the magnet power supplies, klystron modulators (solid state) and static VAR compensators. • 67 staffs + 20 people in industrial support, 22 engineers • ~ 5000 power supplies from 1 kW to 144 MW, from 10A to 30kA, from 8V to 110kV • Recurrent budget = 4 MCHF

  7. CERN Map

  8. POCPA workshop • All sessions in this auditorium • Coffee break at 10H30 & 15H30 at 1st floor • Today lunch will be served at 12H45 restaurant 2 (offered by CERN) • Tuesday & Wednesday lunches will not be served but we can eat together in restaurant 2 (self canteen). • Wi-Fi access • Bus from CERN to Campanile Hotel at 18H30 • Bus from Campanile hotel to CERN at 8H30 on Tuesday and Wednesday • Any question: ask Marie at the coffee break, or call +41764870674 • Monday evening = free time

  9. POCPA visit & Dinner • Tuesday afternoon • a visit of CERN is proposed, Please register • SM18 (Superconducting magnet test facility) • Atlas Visitor Centre • POPS • Meeting point, restaurant 2 at 14H, Bus transport • Tuesday night • Leman lake Dinner (offered by CERN), Please register • Meeting point, CERN hostel (building 39) at 18h00, Bus transport

  10. AGENDA & Convener • Session conveners • Session 1: Bob Lambiase • Session 2: Ju Wang • Session 3: Jörg Eckoldt • Session 4: JP Burnet

  11. Next POCPA • I hope you will enjoy this workshop • We need to choose the place of the next one • To be discussed at the closing session for the next POCPA: • when ? • Where ? • Which subjects ? • Duration? • … • Now, let’s go for presentations!

More Related