An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AFB80 Session 404January 12, 2009 Contractor Best Practices Transportation Research Board Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  2. H. B. Rowe & Co., Inc. • Founded in 1946 • Heavy Highway / Site Development • Licensed in North Carolina, South Carolina, and Virginia Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  3. Slope Stakes Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  4. Grade Stakes (Blue Tops) Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  5. Natural Ground Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  6. 2-D Rough Grading Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  7. 2-D Rough Grading Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  8. 3D Rough Grading Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  9. Bubba’s Rule of Precision • Measure it with a micrometer • Mark it with chalk • Cut it with an axe Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  10. 2D Operator View Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  11. 2-D Manual Grading • Manual control of machine • Quality – skill of operator and checker • Grade along profile between stations? Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  12. Manual Best Practices • Guard stakes adjacent to grade hubs • Notch or Nail grade and correction • Visually mark super-elevation changes • Stay one station ahead of grader Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  13. Maximum SAG crown String Sag • Can easily “check” out of tolerance • Lower and inconsistent string pull • Length on multi-lane can exceed 70 ft • SAG 0.19 ft - Pull 20 lb, String 0.1oz/ft Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  14. Quality Assurance Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  15. 2.5D Sonic Grading • Partial vertical automation • Changes in super-elevation - manual • Grade along profile maintained Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  16. Sonic Best Practices • Steel pins set at Grade Hubs, add 1 ft • String runs 1,000 feet or less • Visually indicate super changes • Complete first pass on string • Calibrate – Cutting edge & tire change • Paint crown and shoulder breaks Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  17. Quality Assurance What happens between stations? Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  18. Surveying “thought I was wrong once but I was mistaken” Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  19. 3D vs Grade Stakes • Assume a interstate project 8.3 km • Grade Stakes every 20 m (4 per station) VS Control Stakes every 320 m 1660 Grade Stakes VS 26 Control Stakes Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  20. 3D Model Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  21. 3D Operator View Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  22. 3D Plan View Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  23. 3D Cross Section View Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  24. 3D Best Practices • Control - Standard • Control – Use it • Control - Maintain Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  25. 3D GPS Grading • Fully automated vertical control • Cross slope changes automated • Grade “anywhere” Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  26. GPS Best Practices • Fixed base station location • Site Calibration - CONTROL • Check consistency daily • Awareness of paper plans Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  27. Quality Assurance Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  28. 3D Robotic Grading • Highly accurate, robotic location Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  29. Robotic Best Practices • Grade Control every 1,000 ft • Establish error limits for set-up • Always measure/update blade wear • Don’t pretend to be a surveyor • Level the mast when benching Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  30. Quality Assurance Need a more advanced string! Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  31. Bubba’s Rule Reversed • Cut it with a laser • Mark it with your thumb • Measure it with a string Forget about sag, just cut out the crown… Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009

  32. Conclusion • Technology enables quality and speed • Best Practices key to higher quality • Quality Assurance slow to adopt Contractor Best Practices – H. B. Rowe & Co., Inc. Jan 2009