1 / 18

SureStart SM Program for Users

SureStart SM Program for Users. 2013. ● Verify Proper Installation ● Verify Code Compliance ● Provide Operational Training & Understanding ● Provide Proper Maintenance Training. Elements of the Program. ● Establish C-R and our representative as the primary technical resources for

Download Presentation

SureStart SM Program for Users

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SureStartSMProgram for Users 2013

  2. ● Verify Proper Installation ● Verify Code Compliance ● Provide Operational Training & Understanding ● Provide Proper Maintenance Training Elements of the Program

  3. ● Establish C-R and our representative as the primary technical resources for one of the harshest man-made environments (High Pressure Steam) ● Improve plant and personnel safety ● We stress the significance of OEM parts Features of the Program

  4. Marketing and Promotions

  5. Power Engineering Magazine – Feb 2010 - 2 pages

  6. ● Training of plant personnel ● Improve operational knowledge and reliability ● Reduced down time with longer service life ● Reduced maintenance time & expense ● Prevent Code violations Benefits for the Customer

  7. ● Cost = $1,500 for one day of on-site service with our qualified engineer, including travel expenses ● The fee for this Program is Waived with significant orders for Complete Boiler Drum Level Indication Systems, valued at $15K net or greater to C-R ● The fee may be negotiated with orders for less than Complete Level Indication Systems, by consulting us to discuss your proposal The Program

  8. ● This program is available for all users of C-R Boiler Trim products ● We will issue a numbered certificate to the primary customer contact (end user) for this service well in advance, in order to coordinate a site date The Program

  9. ● We provide a detailed report including: - List of Instrumentation Evaluated - List of Staff Trained - List of Findings - List of Recommended Inventory Parts (This will establish the correct standard in the plant, with our identification) The Program

  10. The use of non-original equipment manufacturer parts (such as glass, gaskets, probes, modules, etc.) will VOID the agency approval (FM, UL, CSA, CRN, ABS, ETC.), pressure/temperature rating, and the warranty of the instrument. Clark-Reliance requires the use of OEM parts on this product in order to maintain plant & personnel safety and reliable operation. Parts Statement

  11. ● We provide a detailed digital report ● All site activities will be documented ● The report is user friendly, easy to complete, and it is the “Base" for follow-up business. The Report

  12. ● This program is currently available to any user within the Continental U.S. or Canada ● Our factory Engineer / Specialist will accompany our Regional Manager and the Representative for the first one or two Sure Start meetings in their territory The Program

  13. Issues with the installation were identified O & M training was conducted The report was provided to the customer The customer was pleased with our support Our 1st Sure Start Service was Successfully Conducted in January 2010

  14. This kit (Ref: Item # RSSTOOLKIT) contains the tools required for proper maintenance New Sure Start Tool Kit

  15. Summary ● This program is a fantastic opportunity to support our Users from the start of an installation ● Please contact us with any questions?