An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Camborne Field CampaignPlanning Issues

  2. Camborne Site

  3. Sunshine Statistics

  4. Site Details • Radiosonde launches at 11:15 and 23:15 (ZT). • Also run Herstmonceaux and Castor Bay sondes • Have flown Snow White sondes • Part of National Radiaton Sensor Network. • Laser cloud base and visibility measurements • GPS Water Vapour column. • Microwave and other measurements ?

  5. “The Ozone Shed”

  6. FTIR Installation • FTIR installed in Ozone Shed • Solar tracker hard-mounted on concrete base outside South-facing door. • Support structures being designed. • Phone and hopefully internet connections available.

  7. Campaign Timetable • Preliminary installation prior to main campaign (July) • FTIR set up from 11th August • Flight window : 13th August to 26th September • Initial manned period (1-2 weeks) • Other manned periods (of 1 week +) driven by weather conditions. • If flight occurs during unmanned period then we can get to site the evening following a noon flight briefing – in time for measurements the next day. • Staffing : 2 people out of TG, MC & AB.

  8. Other Issues • Liquid N2 : BOC already deliver to site (helium). • Accommodation : • Other instruments ? • Communication between FAAM and Camborne.