Industrial Training at Negombo Court Complex Site W. J. M. K. PERERA (RU/E/2007/119) Department of Civil and Environmental Engineering
Presentation Outline • Introduction to Training Organization • Detail information on the Project • Training Experiences • Problem encountered • ………. • ……….. • ……….
Training Placement - CECB • Central Engineering Consultancy Bureau (CECB) is the largest engineering consultancy organization in Sri Lanka. • CECB offer multi-disciplinary expertise such as Building constructions, Roads, Highways, Bridges and Irrigational works. • Nearly 600 of engineers, architects and geologists are employed under CECB. • They are doing multi billion rupee projects which makes them large profit margins.
Proposed Court Complex Negombo Court Complex Site • Client: Ministry of Justice & Law Reforms. • Contractor: State Engineering Corporation (SEC) • Consultant: Central Engineering Consultancy Bureau ( CECB ). • Contract period: 546 days • Funding: Government of Sri Lanka • Value : Rs. 631 millions
PROJECT DETAILS PHASE 3 PHASE 2 PHASE 1
Setting Out of Staircase Flight and Landing Going (280mm) Thickness of the Flight Rise (165 mm) Staircase Beam Staircase Flight
Preparation of Stair-case Doing Setting Out of Staircase Flight Formwork of Staircase Flight
Soil Compaction • Soil was filled layer by layer and water was sprinkled to bring the moisture content of the soil to the optimum moisture content. • Soil was compacted using Vibratory Roller. • Sand Cone test was done to determine to dry unit weight of the soil Performed Sand cone Test
Termite Treatment • This is done as a protection against termite attack. • Drill holes at 2 to 3 feet intervals along the perimeter of the building. Inject the termiticide. • Then termiticide spray directly to the soil. Spraying termiticide Inject termiticide
Plumbing Work Water Supply Line • 20mm, 25mm, 32mm, 40mm PVC pipes are used. • Pipe lines are checked by applying pressure of 8 bars. Sewer Line • Sewer lines are laid 1:80 slope. • All sewer lines are connected to manhole. Applying Pressure for Supply lines
PROBLEMS & SOLUTIONS ON CONCRETE STRUCTURES Hydration temperature increment in mass concrete structures THERMOCOUPLE WITH DATA LOGGER THERMOCOUPLE LOCATIONS
ADD FLY ASH SOLUTION
Concrete Defects AFTER BEFORE SOLUTION BARA MORTAR
SAFETY MANAGEMENT • Provide Safety Equipments (helmets, safety shoes,boots,googles, gloves and safety belts) • Safety Instruction Boards • Located Medical Centre at the Site • Special Traffic Controlling Section • Charge Fairs from employees for Misbehaviors
Training Experience as a whole • Not only improved the technical knowledge as I discussed. • Obtained a vast knowledge on dealing with all sorts of people • Learned both contractor and consultant point of view when constructing a new building. • Made new friends with industry engineers and other workers. • Say any other activities involved during training period…