1 / 55

The CITRIS Building

The CITRIS Building. An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) Micro-Nano-fab Laboratory (20k asf) Distance Learning Facilities High-tech Classrooms Interdisciplinary Research Space A new focal point for COE Integrate with COE Master Plan .

rafi
Download Presentation

The CITRIS Building

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) • Micro-Nano-fab Laboratory (20k asf) • Distance Learning Facilities • High-tech Classrooms • Interdisciplinary Research Space • A new focal point for COE Integrate with COE Master Plan 

  2. Sutardja-Dai Hall & Marvell Lab • A Brief review of the construction

  3. Demolition of Old Davis HallSept. 2004

  4. Excavation (next to Cory Hall) Dec. 2004

  5. A Big Hole … 5/2005 - 7/2006

  6. A Crane, 190 feet tall, Aug. 2006

  7. View from the Top(Shackleton, Séquin)

  8. The Steel Frame Starts to GrowOct. 2006

  9. Wall Constructions, Dec. 2006

  10. Concrete Pour, Feb. 2007

  11. More Steel … Much More!

  12. Topping-out Ceremony, March 2, 2007 • HonoringDean A. R. Newton( 1951 - 2007)

  13. Roof and “Penthouse” Construction

  14. Hanging GFRC Facade, Aug. 2007

  15. Waffle Slab for Marvell Lab, Oct. 2007

  16. Topping-out the Marvell Lab, Dec. 2007

  17. Marvell Lab,Jan. 2008

  18. Terrace at Level 6, next to Davis Hall,Feb. 2008

  19. Hoisting a Big Air Handler, Mar. 2008

  20. Sutardja-Dai Hall & Marvell Lab • A look of what is going on inside

  21. Level 1: Computer Room

  22. Level 1: Corridor

  23. Level 1: Future “Macro-Lab”

  24. Level 1: Utilities under Marvell Lab

  25. Level 2: Machinery under Marvell Lab

  26. Level 2: Peet’s CyberCafe

  27. Level 2: Distance Learning Rooms

  28. Level 2: Atrium Stairs

  29. Level 3: Atrium

  30. Level 3: Atrium

  31. Level 3: Auditorium

  32. Level 3.5: Lower Marvell Lab • (Photolithography)

  33. Level 3.5: Marvel Lab (Air Filtration)

  34. Level 4: Carrel Space (West)

  35. Level 5: Carrel Space (East)

  36. Level 5: Lab Administration

  37. Level 5: Upper Marvell Lab • (Diffusion Furnaces)

  38. Level 6: Terrace

  39. Level 6: Bridge to Cory

  40. Level 6: Lounge

  41. Level 6: Lounge (and view)

  42. Level 6: Carrel Space (East)

  43. Level 7: Carrel Space (East)

  44. Level 7: Carrel Space (West)

  45. Level 7: Carrel Space (East)

  46. Level 8: Roof (March 2008)

  47. Roof (April 2008)

  48. Roof: Air-Handler Maze

  49. Level 9: View of Marvell Lab Roof (Mar. 2008)

  50. Marvell Micro- Nano-Lab

More Related