400 likes | 571 Views
Thank you from HPC. Model production suite timeliness and reliability Forecasters know that model output will be timely and available Continued excellent working relationship Responsive to inquiries and requests Support and improvements for operational models Collaboration/support for HPC
E N D
1. Hydrometeorological Prediction Center 2009 Review
2. Thank you from HPC
3. Outline
4. HPC Operations
5. QPF
6. FY09 QPF – D1 Threat ScoreHPC vs. NAM/GFS/ECMWF
7. FY09 QPF – D1 BiasHPC vs. NAM/GFS/ECMWF
13. 24 hr Rainfall Ending 12Z 21 Sept
14. 24 hr Rainfall Ending 12Z 21 Sept
15. HRW Run (WRF-NMM)
19. HRW Wish List
20. SREF Improvements
21. HPC SREF Wish List
24. HPC Winter Weather Desk2008–2009 Verification – Snow/Sleet
25. Winter Weather Low Tracks24-h RMSE Trend
26. Winter Weather Wish List
27. Medium Range
29. HPC Alaska Medium Range Evaluating NAEFS downscaled and bias-corrected sensible weather element guidance for Alaska Medium Range, including 10-50-90 percentiles.
30. Exploring GFE Conducting initial exploration into using GFE at HPC
34. Other Projects
37. Howard Hanson Dam Support Green river empties into Puget Sound
Leaks detected early 2009 – repairs ongoing
HPC providing:
QPF and PQPF for NWRFC and WFO SEA through day 7
Twice daily statement of the possibility / confidence of liquid precipitation of 4 or 6 inches in any 24-hour period through 7 days.
38. Summary of HPC Wish List
39. Backup