160 likes | 173 Views
This update provides information on the approval of various NPRRs by the ERCOT Board and the TAC leadership voting results. It also mentions the tabling of a revision request regarding load profile models.
E N D
January 28, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott TAC Update to RMS
December 2015 Board Update • On December 8, 2015 ERCOT Board Approved: • NPRR641, Season Definition Change for Switchable Resources Reporting Unavailable Capacity • NPRR702, Flexible Accounts, Payment of Invoices, and Disposition of Interest on Cash Collateral • NPRR705, Provides Consistency for References to the End Date of the Generation Interconnection Process • NPRR708, Clarifying ERCOT Actions During Energy Emergency Alerts • NPRR712, Clarification of RUC Process • NPRR715, Clarification of Generator Modeling in the Market System • NPRR716, Corrections to Aggregated Load and Participant Specific Generation Data Requirements • NPRR719, Removal of Trigger and Requirement to Reduce the Distributed Generation (DG) Registration Threshold • NPRR725, Modifications to CDR PUN Capacity Forecasting and PUN Net Capacity Reporting Requirements • NPRR726, Daily Network Operations Model PSS/E File Posting Modification TAC Update to RMS
December 2015 Board Update • On December 8, 2015 ERCOT Board Approved : • NPRR727, Removal of Language Related to NPRR327, State Estimator Data Redaction Methodology • NPRR728, Removal of Language Related to NPRR484, Revisions to Congestion Revenue Rights Credit Calculations and Payments, and NPRR554, Clarification of Future Credit Exposure Calculation • NPRR729, Clarification of Metering Requirements for Resources • NPRR730, Elimination of the RUC Behavioral Pricing Rule • NPRR731, Changes to Annual Reporting Requirements for RUC Decommitment Payment Amounts • NPRR732, Adjustments to Verifiable Costs for Required Resubmissions and Clarification of RUC Forced Outage and Cancellation Procedures • PGRR045, Alignment with NPRR705, Provides Consistency for References to the End Date of the Generation Interconnection Process • RRGRR007, Adding Solar Resource Registration Inputs • SCR786, Retail Market Test Environment • Panhandle Regional Planning Group Project • 2016 Methodology for Determining Minimum Ancillary Service Requirements TAC Update to RMS
2016 Leadership Voting • Technical Advisory Committee 2016 TAC Leadership • Chair: Randa Stephenson LCRA • Vice Chair: Adrianne Brandt CPS • Announcement: Kenan Olgeman TAC’s ERCOT CEO Designee • Subcommittee Leadership Unanimously Confirmed by TAC: • Commercial Operations Subcommittee (COPS) • Chair: Michelle Trenary, Tenaska Power Services • Vice Chair: John Schatz, TXU Energy • Protocol Revision Subcommittee (PRS) • Chair:Amanda Frazier, Luminant • Vice Chair: Chris Lyons, Exelon • Reliability and Operations Subcommittee (ROS) • Chair: Alan Bern, Oncor Electric Delivery • Vice Chair: Boone Staples, Tenaska Power Services • Wholesale Market Subcommittee (WMS) • Chair: Jeremy Carpenter, Tenaska Power Services • Vice Chair: David Kee, CPS Energy TAC Update to RMS
PRS Initiatives and Votes • Nodal Protocol Revision Requests (NPRRs) • NPRR691, Alignment of Protocols with NERC Reliability Standard, BAL-001-TRE-1 – Approved • NPRR713, Reactive Power Testing Requirements - Approved • NPRR720, Update to Settlement Stability Reporting Requirements - Approved • NPRR734, Digital Attestation Signature Authority Expansion - Approved • NPRR739, Prohibiting Load Resources in Participating as Dynamically Scheduled Resources - Approved • NPRR740, Retail Clarification and Cleanup - Approved • NPRR742, CRR Balancing Account Invoice Data Cuts - Approved • NPRR743, Revision to MCE to Have a Floor For Load Exposure - Approved • Note: Amanda Frazer announced that NPRR667 will be on the PRS agenda for the February 11th meeting. This NPRR will be at the end of the agenda following the scheduled voting items to allow as much time as possible for Market Participant’s discussions. TAC Update to RMS
Tabled and/or Withdrawn Revisions • Revision Request Previously Tabled: • LPGRR055, Extend Load Profile Model Calendar Inputs to 2030 – • This Load Profiling Revision Request (LPGRR) extends the Load Profile Model calendar-related inputs in Appendix E, Profile Model Spreadsheets, from 2020 to 2030. The calendar inputs include calendar variables, daylight savings variables, sunrise/sunset times and holiday variables. Corresponding changes to calendar-related inputs will be made to the Load Profile Models in MetrixIDR • 01/28/TAC Vote: Motion to Approve with the Profile Working Group’s comments was Unanimous TAC Update to RMS
WMS Initiatives and Votes: • Wholesale Market Subcommittee (WMS) • http://www.ercot.com/content/wcm/key_documents_lists/76817/10._WMS_Update_to_TAC_012816.ppt • Response to PUCT Memo regarding ORDC (Possible Vote) • http://www.ercot.com/content/wcm/key_documents_lists/76817/10._SAWG_ORDC_Discussion__Analysis__and_Positions_1_11_16.pdf • TAC Unanimously Endorsed the SAWG ORDC Discussion, Analysis and Positions document without prejudice to any specific option and requested that ERCOT file this ORDC Response to the Commission. TAC Update to RMS
ROS Initiatives and Votes: • Reliability Operations Subcommittee (ROS) • http://www.ercot.com/content/wcm/key_documents_lists/76817/11._ROS_Report.zip • NOGRR143, Alignment of Nodal Operating Guides with NERC Reliability Standard, BAL-001-TRE-1 (Vote) • Recommendation to Table to allow NOGRR143 to sync-up with NPRR691 once taken up by the Board on February 9th • Motion to Table was Unanimous • NOGRR147, Reactive Power Testing Requirements (Vote) • Budgetary cost to implement this NOGRR needed to be approved at the February Board to sync with the associated NPRR. • Motion to Approve as recommended by ROS was Unanimous TAC Update to RMS
COPS Initiatives and Votes: • Commercial Operations Subcommittee (COPS) • http://www.ercot.com/content/wcm/key_documents_lists/76817/12._COPS_UPDATE_TO_TAC_012816.ppt • Market Data Working Group (MDWG) Update • MISUG Update • MISUG has evolved since its inception in 2011 • MISUG encompasses all data-related issues • Name Change: Market Data Working Group (MDWG) • Current plan is to continue to report to COPS • TAC requested that COPS revisit MDWG Scope since “Data” could be misunderstood to include “All” data in the market including SMT and/or AMS Meter Data, which wasn’t the intent or the scope of MDWG. TAC Update to RMS
RMS Initiatives and Votes • Retail Market Subcommittee (RMS) Update • http://www.ercot.com/content/wcm/key_documents_lists/76817/13._RMS_Update_to_TAC_01_28_16.ppt • http://www.ercot.com/content/wcm/key_documents_lists/76817/13._2015_RMS_Goals___TAC_Approved_20150326_End_of_Year__Report_Card_12_31_15.doc TAC Update to RMS
DREAM Taskforce Update • Distributed Resource Energy and Ancillaries Market Taskforce (DREAM) • http://www.ercot.com/content/wcm/key_documents_lists/76817/14._TAC_Dream_Report_Draft___2016_01_22_DREAMTF.docx • February DREAM TF will come back to TAC with their completed report. TAC’s plan will be to conduct a half day workshop to discuss Dream’s recommendations on February 24th with TAC voting on those consensus items on February 25th. • TAC membership thought it would be helpful to have the half-day workshop prior to voting for those that haven’t been involved in the prior DREAM Taskforce meetings and/or market discussions. TAC Update to RMS
Ancillary Services Re-design Update • FAS (NPRR 667) • http://www.ercot.com/content/wcm/key_documents_lists/76817/15._High_Level_Schedule_for_NPRR_667_as_of_1_21_16_1347.docx • Timeline proposed with TAC’s revisions: • February 1, 2016: NPRR667 workshop to review Stakeholders’ comments • February 11, 2016 : PRS meeting with possible vote on NPRR667 • March or April TAC Meeting: TAC meeting with possible vote on NPRR667 • Subsequent Board Meeting: Board of Directors meeting June 14 or August 9th depending upon when TAC takes up NPRR667 TAC Update to RMS
Other Business • Appeal Process Discussion • Chad Seely (ERCOT Legal) updated TAC concerning Appeal of NPRR649 has been noticed to the market by ERCOT and this Appeal has been scheduled for the ERCOT Board on February 9th. • If any commenters planned to speak at the Board concerning this Appeal, Chad Seely (ERCOT) needed to know this information by close of business Monday, February 1, 2016. • Market Continuity Planning • Blackstart discussions, ERCOT is ready to start developing during and post procedures to be invoked during a Blackstart event. • TAC directs the creation of a Taskforce/Workshop because this affects all aspects of the market. TAC agreed to plan for a Workshop in March and/or April with ERCOT leading the effort to get Workshop(s) kicked-off. TAC Update to RMS
Other Business • Market Continuity Planning (cont.) • Some questions?: • What happens if systems are down for 3 days or more days– what do we do as a market? • How long should or will we go before cash flow becomes an issue? • What is the plan during event/steps to be taken by whom, when and clean-up post event? • What happens when transactions and market processes unavailable for multiple days? • Extended Emergency Period and how do we function during the emergency period? • Per ERCOT “Better to be prepared for the what if scenario than to wait until it occurs. “ • Action Item: Per Kenan (ERCOT), ERCOT will frame and place some structure around the issue in preparation for workshop. TAC Update to RMS
2016 Goals and Strategic Initiatives • http://www.ercot.com/content/wcm/key_documents_lists/76817/06._2015_TAC_Goals.doc • TAC Discussion – • Suggested changes to: • Goal #2 to include promote market solutions and remove market • Goal #9—and improve the integrity and availability of AMS data to Market Participants. • http://www.ercot.com/content/wcm/key_documents_lists/76817/06._2015_TAC_Strategic_Initiatives.docx • TAC Discussion - • Suggested the adding the underlined words for • “Smart Meter Texas transition and governance (pending before the PUCT) – • Voting on “Final 2016 TAC Goals and Strategic Initiatives” expected to be conducted during the February 25thTAC meeting. TAC Update to RMS
Questions? TAC update to RMS