1 / 8

Posting Results of RTD in a Display Format

Posting Results of RTD in a Display Format. Floyd Trefny AMTEC August 14, 2012. Use of RTD Forecasts. Many Large Industrial Loads purchase at least a portion of their power based on the Real Time LMP for a Load Zone

ramya
Download Presentation

Posting Results of RTD in a Display Format

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Posting Results of RTD in a Display Format Floyd Trefny AMTEC August 14, 2012

  2. Use of RTD Forecasts • Many Large Industrial Loads purchase at least a portion of their power based on the Real Time LMP for a Load Zone • RTD provides a source for forecasted prices, but currently is only in a CSV or HTML format • RTDs output files show LMPs for all Resource Nodes, Hubs, and Load Zones in a sequential order • To understand potential price excursions, a history of forecasted prices for an individual location is needed • Low prices can be as important as high prices • Loads need to be able to access MIS directly from ERCOT using simple off-the shelf products • Windows IE, Firefox, etc.

  3. Modifications to ERCOT Public Market Price Reports • Add New Displays: • RTD Load Zone Forecasted Prices • RTD Hub Forecasted Prices

  4. RTD Load Zone Forecasted Prices Real-Time LMPs for Load Zones LZ_AEN LZ_CPS LZ_HOUSTON LZ_LCRA LZ_NORTH LZ_RAYBN LZ_SOUTH LZ_WEST Selection of a Load Zone Brings Up Display as Formatted on next Slide Similar Screen for ERCOT Hubs

  5. RTD Forecasted LMPs for Load Zones

  6. RTD Forecasted LMPs for Load Zones

  7. RTD Forecasted LMPs for Load Zones

  8. Questions

More Related