Move to FNL. ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3 / B4. ECAL/HCAL Movable Table Setup no change in basic dimension. Setup in test beam area update beam area ground dimension. ECAL/HCAL Movable Table Control room ?. HCAL Movable Table
E N D
Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4 CALICE technical review
ECAL/HCAL Movable Table Setup no change in basic dimension CALICE technical review
Setup in test beam area update beam area ground dimension ECAL/HCAL Movable Table Control room ? HCAL Movable Table placed in MTB6-B3 ? CALICE technical review
Setup in test beam area inner height ? other equipment ? dump shielding concrete roof support CALICE technical review
Setup in test beam areaone escape route is sufficient ? Escape rote from B4 blocked CALICE technical review
Setup in test beam areacrane height and crane load critical needed hook height over roof 4 m transport weight 15 tons CALICE technical review
Setup in test beam area total height ~ 4 meter CALICE technical review
Setup in test beam areapermanent closed roof (except openings) • installation of Movable Table HCAL and ECAL • with “tricks” only • installation of HCAL modules in position B3 critical • crane needed ! CALICE technical review
Infrastructure at Fermilab(Joe Howell) • Power Conversion • Experiment 2 x 50 Hz 400 VLL 25-32 A • Standard Fermilab 60 HZ, 208v/120v or 480v • Initial checks indicate there is no existing on-site conversion equipment • Continue checking options • Data Transfer • Desire at least 1 Gbit/s Eathernet Link • Erik Ramberg is checking current capacity CALICE technical review
Operations Readiness Clearance(Joe Howell) • Approval given by the Fermilab Partical Physics Division Head indicating that the experiment is safe to operate • Safety Review Committees • Mechanical and Conventional Safety • Electrical • Fire (and flammable gas) • Documentation Review and Equipment Inspection • Help provided to guide through the process CALICE technical review