An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deferred MaintenanceUTSA Strategic Resource Planning CouncilMarch 18, 2009 http://facilities.utsa.edu

  2. Terms • Deferred Maintenance (DM) • An existing or imminent building maintenance-related deficiency from prior years that needs to be corrected, or scheduled preventive maintenance tasks that were not performed or were postponed due to insufficient funding. • Current Replacement Value (CRV) • Essentially it is the total current cost to replace a facility or group of facilities with comparable facilities. • Annual Facility Maintenance Operating Expenditures • All expenditures to provide service and routine maintenance related to facilities and grounds. Includes expenditures for major maintenance funded by the Annual Facilities Maintenance Operating Budget. http://facilities.utsa.edu

  3. Facility Condition Index (FCI) • Fall 2008 Deferred Maintenance = $74 million • Fall 2008 Current Replacement Value = $ 1,057 million • FCI = $74 million/$1,057 million = 7.02 % • NACUBO FCI Recommendations • Good – 0 to 5% • Fair – 5% to 10% • Poor – greater than 10% FCI = Deferred Maintenance (DM) Current Replacement Value (CRV) http://facilities.utsa.edu

  4. Overall DM Backlog and Facility Condition Index http://facilities.utsa.edu

  5. Current Replacement Value Index (CRVI) Annual Facility Maintenance Operating Expenditures CRVI = • UTSA Facilities Operations 2008 = approx. $6.0 million • FRRM E&G Current Replacement Value = $700.6 million • $6.0 million / $700.6 million = 0.86% • Recommended CRVI is 2% to 4% Current Replacement Value Represents the level of funding provided to adequately maintain the institution's educational and general (E&G) capital assets. http://facilities.utsa.edu

  6. Current Annual “Facilities Asset Renewal” Process • Facilities provides annual update of UT System Facility Renewal and Rehabilitation Model (FRRM) • Provides high level forecast of major building component life cycles and expected failures • Tracks accumulated deferred maintenance and replacement value amounts, used in calculation of FCI • Maintenance and Engineering staff identify specific projects based on failures or observed deterioration of system performance • Use relatively new (2 year old) objective criteria to prioritize Deferred Maintenance projects http://facilities.utsa.edu

  7. Planned Annual “Facilities Asset Renewal” Process • Implementing campus-wide formal Preventive Maintenance program • Pilot program of engineered facility condition assessments • Supports realistic FCI calculation • Provides project specific requirements • Provides improved multi-year project planning • Deficiency database to track identified requirements: • Improves input data for FRRM • Provides increased opportunities to address deficiencies in renovation projects • Application of objective priority criteria assures most important work gets done • Annual Facilities Work Plan with well coordinated, firm, weekly schedules • Monthly Operations Reviews to manage performance http://facilities.utsa.edu

  8. DM Project Scoring and Ranking Maximum Score is 109.5 *RAC = Risk Assessment Code http://facilities.utsa.edu

  9. Deferred Maintenance Funding History http://facilities.utsa.edu

  10. Current Project ListsFY04-FY07 “Old” Funding 18 Mar 2009 Projects and Expected Completion Dates http://facilities.utsa.edu

  11. Current Project ListsFY08 “Base” Funding 18 Mar 2009 Projects and Expected Completion Dates * Engineering and Project Management Projects http://facilities.utsa.edu

  12. Current Project ListsFY08 Additional $662K DM Funding 18 Mar 2009 Projects and Expected Completion Dates http://facilities.utsa.edu

  13. Current Project ListsFY09 “Base” DM Funding 18 Mar 2009 http://facilities.utsa.edu