1 / 17

Next Generation ISEA Roadmap

Next Generation ISEA Roadmap. Required Changes. Enabling Actions. Drivers. Implementation. Shortened Response Time. NG ISEA. Stove Piped Budgets. Tools. Optimized Manning. Information Superiority. Infrastructure. Shore Infrastructure Reduction. Workforce. Innovation.

rbohannon
Download Presentation

Next Generation ISEA Roadmap

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Next Generation ISEA Roadmap RequiredChanges EnablingActions Drivers Implementation Shortened Response Time NG ISEA Stove Piped Budgets Tools Optimized Manning InformationSuperiority Infrastructure Shore Infrastructure Reduction Workforce Innovation NG ISEA Investments and Pilots Accelerated Refresh Times AdvancedT&E Technology Advances Organization Experiments Shortened Development Times Processes Joint / Multi-National/ Interagency Ops Asymmetric Missions / Threats K N O W L E D G E M A N A G E M E N T

  2. Required Changes TOOLS - Data Access, Integration - Distance Support - Predictive Readiness ORGANIZATION • - Flexibility - Teaming - Govt - Contractor - Academia PROCESSES - Test & Evaluation - Fleet Support - Technical Documentation - Installation / Modernization - Readiness Assessments - Configuration Management INFRASTRUCTURE - Connectivity - Facilities & Equipment - Joint / Multinational / Interagency Labs - Virtual Test Capability - Multi-Site Integration WORKFORCE - Composition - Recruiting / Retention - Workforce Development

  3. Operational Readiness Test System Tech Assist Remote Support(ORTSTARS) Hai Tonthat PHD NSWC Code A41 (805)228-7287 Tonthath@phdnswc.navy.mil

  4. Purpose • PHD initiative to develop an In-Service-Engineer concept to provide emergency remote technical assistance support for the AWS via ORTS from shore to ship. • Funded by NAVSEA PHD Command for proof of concept

  5. ORTS • ORTS Overview: • Operational Readiness Test System provides automatic and operator initiated on line monitoring of fault detection (FD) and fault isolation (FI) test operations performed on AEGIS Weapon System (AWS) elements.

  6. ORTSTARS • Objectives • Provide tech assist remote support via classified network (SIPRNET) • Real Time support for Aegis Weapon System readiness • Reduce the elapse time between the service request and service support • Provide direct data and communication between ship and support agency • Better definition (FD/FI/Corrective Maintenance) • Better support service (Resources available) • Reduce Cost (Travel, man hour) • Support reduced manning concepts

  7. ORTSTARS Architecture

  8. ORTSTARS Concept via ORTSNET/SIPRNET • Utilizing NetMeeting application to remotely connect and control the ORTSNET workstation onboard USS JACINTO (CG-56) through SIPRNET classified network connection. USS JACINTO (CG-56)

  9. ORTSTARS Connection and Configuration • Setup and connect ORTSNET Workstation as a SIPRNET client. • Two (2) separated removable hard drives for each network configuration. • Remote Operation: • ORTSTARS enabled. (Install ORTSTARS hard drive) • Configure as a node in SIPRNET LAN • Ship is monitoring the process. • Testing is collaborated with shore site • Local Operation: • ORTSTARS disabled. (Remove ORTSTARS hard drive and re-install ORTSNET hard drive) • Configure as a node in ORTSNET LAN • Normal ORTS operation • No remote access

  10. Monitor AEGIS WEAPON SYSTEM STATUS

  11. PERFORM FAULT DETECTION and ISOLATION

  12. Services • What service will it provide? • Real time remote tech assist • Real time readiness view of AWS by ISEA • Maintenance support • How do I? • My fault result is? • Are my MRC’s, Drawing, Tech Manual correct?

  13. Access Authorization • Who controls the service? • Ship CREW must request service and connect ORTSNET to SIPRNET . • Can anyone test my ship without my knowing? • No! Ship must request and give permission for remote connection • Ship is capable of monitoring the tests being performed

  14. ORTSTARS LOGISTICS SUPPORT Remote Sensing – ISEA Distance Support ISEA DISPLAY Diagnose Failure to LRU FLEET Repair/Fix - LRU • AEL Tools • TM Trouble Shooting • PMS Maintenance Action • APL Part Replacement • Identify Part Location Query Other Ship ORTSTARS Cross Deck ORTS Workstation Parts • Query Other Ships for Part Distance Support Logistics

  15. Next Generation ISEAIn Service Engineering Integrated Solutions that Link Capability, Maintainability, Reliability and Readiness Accelerate Change Improve Readiness Reduce Cost

  16. The Next Generation … In Summary • More Complex Fleet Requirements • Joint / Coalition / Interagency Operations • Maximum Readiness within Finite Resources • Challenging Operational Environment • Shorter Time Constant • SEA Power 21 • Asymmetric Missions • Knowledge Focus • Mission Control Center • Aggregation of Subject Matter Expertise (Collaborative Engineering Environment) ENSURING SAFE & EFFECTIVE WARFARE SYSTEMS REMAINS THE GOAL

More Related