1 / 35

TPC-Meeting : Københaven 2.9.02

TPC-Meeting : Københaven 2.9.02. Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : Contacts Cooling --> Liquid Cooling --> Gas. Ne-CO 2 - Gas System :. Mixing Unit ok Compressor Rack ok Cleaning Cartridges ok Pressure Tank ok

Download Presentation

TPC-Meeting : Københaven 2.9.02

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC-Meeting : Københaven 2.9.02 • Ne-CO2 Gas System : Status • CO2 - Gas System : Insulating Gap • Resistor Rod : • Contacts • Cooling --> Liquid • Cooling --> Gas

  2. Ne-CO2 - Gas System : • Mixing Unit ok • Compressor Rack ok • Cleaning Cartridges ok • Pressure Tank ok • CO2 - Remover prep • Hardware ready --> Jan 2003 • Slow control --> mid 2003

  3. Ne-CO2 - Gas Quality Controls • CO2 - Monitor (0.1%) --> permanent • 2(O2 & H2O) -Monitor’s --> permanent • 2 Goofie - Drift-Monitors --> permanent • Drift vel : < 1 %o • Gas (in & out; mounting: near TPC-vessel) • Gas Chromatograph --> if needed • N2; impurities(CHn; SF6 ; ect.);

  4. CO2 - Insulation Gap Gas System • CO2 - Recovery : • Closed System • Design Meeting --> Alice week: sept.02

  5. TPC_Resistor Rod • Promised : • Weight Watching & Contacts : • *1/4 & 100 cm Model • Cooling Tests : • 100 cm Model • HV & Security Tests : • 200 cm Model

  6. Contacts

  7. Water flow

  8. Cooling Efficiency :--> T.M --> BTC !

  9. Rod - Cooling Systems • Leakless Water Cooling • Control System : like FEC’s • 10 mm Pipes • Cost : 25 kSFR • CO2 - Gas Cooling • 60 mm Pipes & 50 m • Leaks into Ne_CO2 Volume ??? • Cost : (30 components + 30 labor (?) + • 20 heat exchanger ) --> 80 kSFR (?)

  10. Rod-HV- Tests • 300 kV HI-Injector @ GSI • 30 Years of HV-Operation • With : • Distilled Water-Resistor Chain

  11. 300 kV GSI Ion Source : • Uses since 30 years : • Destilled Water Channel as 300kV Divider • Interlock : Water Quality • < 2 µ Siemens / cm Resistor Rod HV test : • Rod-Cooling Water Channel --> • Connected to HV with Copper-Return Bridge • Additonal parallel resistor : --> f(water quality) Are’s test setup:

  12. HV-Test @ GSI HI - source • Rod in Nitrogen Atmosphere • Rod filled with : • Nitrogen • Distilled Water ( < 0.1 & <1 µ Siemens) • Circulation Pump OFF • Tap - Water • ∂V_last Resistor • & Total Rod Current

  13. Conclusions : I • Removable Resistor Rod : • Possible --> go_to --> 250 cm • AGC --> • very efficient -> results soon • Price & Space • Liquid Cooled Rod : internally save : • HV & Leak • Ceramic Bridge --> Security Factor: * 1015 • Rod Resistivity = f (water quality) --> adjust !

  14. Conclusions : II • Remaining Heat Sources in TPC • G_Ohm Resistor Chain -> up to 4 Watt Let’s Cool them !!!

  15. 4W - Distilled Water Resistor Chain • Adjust Water Quality : • --> (0.05 and 2) µ_Siemens • ( 18 --> 0.5 ) M_Ohm / cm • TPC Gas Heat Problem gone !

More Related