1 / 10

GBI Strategy 2010 - 2012

GBI Strategy 2010 - 2012. Equipping Christian leaders for the transformation of society. GBI Strategy 2010 - 2012.

reese
Download Presentation

GBI Strategy 2010 - 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GBI Strategy 2010 - 2012 Equipping Christian leaders for the transformation of society

  2. GBI Strategy 2010 - 2012 • Quality programs provided to church and Christian NGO workers that is recognized by the NCHE at the Certificate and Diploma levels with a Provisional License while working towards classification status • A sustainable model whereby GBI raise 50% of the yearly budget from within Uganda. • Develop, manage and maintain a modern campus for training leaders in the developing African context. Equipping Christian leaders for the transformation of society

  3. GBI Strategy Time Line 2010 - Phase One 2011 - Phase Two 2012 - Phase Three • NCHE Provisional License maintained • Income ratio 35% Africa 65% United States • Diploma in Child Studies Introduced (January) • Campus • GBI Relocate to campus • First disabled students accepted • Fund raising for phase 2 starts • NCHE Provisional License • Income ratio 25% Africa 75% United States • Certificate in Disability Studies Introduced (June) • Governance Model in place • Campus • Lease agreement in place • Phase 1 construction begins • Campus made suitable for differently able students and staff • NCHE Classification Applied for • Income ratio 50% Africa 50% United States • Campus • Phase 2 construction begins Activities Inputs Outputs • Go-Live Checkpoint Presentation including: • Launch plan review • Support plan review • Post-implementation Review • Etc. • Operating Model • Capability scope and value proposition (from Define Review) • Final functionality and capability specs (from Design Rev. to Dev. Release) • Etc. Elections in Uganda

  4. GBI Expected Progress Against Plan

  5. GBI Stakeholders • GBI Board – established for the overall direction of the school and a legal entity for oversight of the school • GBI Staff – the paid and volunteer staff who provide day-to-day oversight of the school and are responsible for the implementation of the vision for the school • GBI Students – the consumers of the school and representatives of our leadership training • ARM UG – has administered the finance and human resource of GBI for the first 3 years of existence, as well as providing oversight for the yearly strategic plan • Partner Churches / Community • – sending students, employing graduates • ARM US / Donors • – provision of finance and in kind donations as well as counsel • and participation in planning

  6. Critical Success Factors • Stakeholder acceptance and support of change • A long term land agreement with ARM • Recruitment and retention of staff • Adequate training for current GBI staff • Funding for ongoing improvements to GBI programs • Funding to bring our new campus up to NCHE standards • GBI receiving a Provisional License from the NCHE in a timely manner • Building a positive image in the community and throughout the country

  7. Risks • New Guidelines from NCHE were published in 2001 and 2006, it is possible that new revisions could be in place for 2011 • Delayed accreditation from the NCHE will continue to make it a challenge to recruit students and find donors for GBI • Current non-compliance with NCHE could convince the NCHE to shut GBI down, as has happened with other schools • Monarchy and land related riots • Riots and disturbances from the 2011 Elections • Conflicting interest of board members could keep GBI’s best interests from being addressed • Community sabotage if the move of GBI to the Maranatha Secondary School campus is not communicated well • Another similar school receiving their provisional license before GBI could pull away potential donors and students • GBI’s unwillingness to pay bribes may have negative impact • Social change such as the discovery of oil and influx of Muslims

  8. Similar Institutions • Glad Tidings – Established in 1960 / yet to receive Provisional License – Pentecostal • Kampala Evangelical School of Theology (KEST) – Established in 1989 / Provisional License in 2006 – Anglican • Uganda Baptist Seminary – Established in 1988 / Provisional License 2006 – Baptist • Uganda Bible Institute – Established in unknown / Provisional License 2008 – Anglican • Information collected from www.unche.or.ug and various school websites.

  9. GBI Financials 2010 • Budgeted Expenditure UGX 249,806,754 • Predicted Income UGX 225,595,200 • Budgeted Expenditure $138,781 • Predicted Income $125,330 • Major Changes Over 2009: • 15% of all Admin overhead saved (- $13.9K) • Increase in staff, a librarian and two department heads (+$ 24K) • Library donation (+ $13k) • Inflation running at10+% • New costs of Audit, legal and NCHE added (+ $5K) • Formal Marketing/recruitment plan included (+ $14,500) • New property rental costs for Boys Hostel previously free of charge • We are still working with 2 foundations and a number of churches to meet our income needs for 2010 • A separate budget has been created for the development of the new Campus.

  10. Income and Expenditure 2007-2009

More Related