1 / 12

Content of the p resentation

Content of the p resentation. Progress and Crisis (2004-2006 and 2007-2013) Closure & Reporting (2004-2006) Systems and Simplification (2007-2013 and post 2013) Monitoring & Evaluation (2007-2013) Lessons learned and Future (post 2014) Any Other Business and Conclusions. 1.

reganne
Download Presentation

Content of the p resentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Content of the presentation • Progress and Crisis (2004-2006 and 2007-2013) • Closure & Reporting (2004-2006) • Systems and Simplification (2007-2013 and post 2013) • Monitoring & Evaluation (2007-2013) • Lessons learned and Future (post 2014) • Any Other Business and Conclusions 1

  2. 2. Closure and Reporting (2004-2006) 2.1. Closure 2

  3. Flexibility rule used as described in the EC closure guidelines 3

  4. Funds overcommitted • 6 MS (CY, HU, LT, LV, PL, SI) have overcommitted up to 10 % • CY, LV, SI have overcommittedmore than 10% in ERAF • HU has overcommittedmore than 10% in ESF • LV has overcommitted more than 10% in FIFG 4

  5. Specific national guidelines for closure – in 8 MS (I) 5

  6. Specific national guidelines for closure – in 8 MS (II) • Final controls by the IBs (CY) • Financial guidelines (SK) • Monitoring (PL, SK) • Verification reports and statements (CY,SI)

  7. Specific problems with closure of the 2004-2006 programming period • 5 MS (EE, MT, LT, PL, SI) have specific problems related to the closure of programmes 7

  8. 2. Closure and Reporting (2004-2006) 2.2. Arrangements for post-implementation monitoring 8

  9. Guidelines for post-implementation 3 MS (HU, LV, SI) have guidelines for post implementation 9

  10. Mechanisms to ensure that considerable modifications do notoccur within the 5 yearperiod 10

  11. 2. Closure and Reporting (2004-2006) 2.3. Cohesion Fund 11

  12. Financial corrections and hearing procedures in CF, closures of CF projects • 2 MS – HU and LV – have Cohesion Fund projects to be continued after 31.12.2010 • EC has proposed financial coorections in 6 MS (CZ, EE, HU, LT, LV, SK) • 3 MS (LT, PL, SK)had hearing procedures regarding financial corrections 12

More Related