EMMA DELIVERY UPDATE Neil Bliss
CONTENTS • Layout update • Injection line • ALICE Pb wall • Procurement status
INJECTION LINE Tomography Section Screens x 3 (emittance measurement) New Quadrupoles x 13 New Dipole 30° & BPM at dipole entrance New Dipoles x 2 (33°) & BPMs at dipole entrance Screen Screen & Vert. Slit SRS Quadrupoles x 6 New Dipole 30° Vacuum valve Screen Beam Direction Vacuum Valve Wall Current Monitor ALICE Faraday Cup Spectrometer Screen BPM Neil Bliss
INJECTION LINE Vacuum valve Tomography Section Screens x 3 (emittance measurement) SRS Quadrupoles x 3 Screen SRS Quadrupoles x 2 BPM & Wall Current Monitor Vacuum valve Screen Screen & Vert. Slit Beam Direction New Dipole 30° New Quadrupoles x 13 Ion Pump New Dipoles x 2 (33°) & BPMs at dipole entrance
ALICE 1st Arc Pb Wall SHIELDING WALL THICKNESS: 50 mm Pb
Production Quadrupole Yokes and Clamp Plates • 42 QFs poles have been wire eroded and returned from Metric (sub contractor) and are awaiting painting. • 20 QDs have been assembled • One in five yokes have been measured at Tesla and are within tolerance • Clamp plates laminations have been punched. Stacking and bonding is in progress • Delivery July 16 – Oct 18
Production coils • All coils are wound and over wrapped • 44 QD and 66 QF coils are potted • Brazing and bending of terminations is in progress
Production Cavities Machining • Machining is complete • EB welding in progress • Brazing • Re measure Frequency & Q • Dimensional checks • Chemical etching • Clean • Assemble and pump down • Measure F & Q • Leak Check • Bakeout • RGA & vacuum measurement • Delivery of 7 batches 10 Jul – 10 Sep E B welding
Procurement Exercise Progress • Injection line magnets Contract placed with Scanditronix 29.5.08 required delivery – 4 x dipoles 1.9.08, 12 x quadrupoles 12.10.08 • Ring standard vacuum chamber Tender 23.5.08 – 11.6.08 required delivery 8.10.08 • BPM quotation Tender return 6.6.08 required delivery 29.8.08 • RF system OJEC Tender 12.4.08 – 23.6.08 required delivery 28.2.09 • Septums, kickers & kicker power supplies OJEC Tender 23.6.08 – 7.8.08 required delivery kickers & power supply 3.4.09, delivery of septums 10.11.08