THE NEED FOR ENVISION TM

THE NEED FOR ENVISION TM. August 2012. Resource Depletion. ASCE’s Report Card for America’s Infrastructure. 15 categories r ated Overall grade of D $2.2 trillion Ranked 23 rd worldwide. America’s Infrastructure Today. Development vs. Impact. The Future of Infrastructure.

remy
Download Presentation

THE NEED FOR ENVISION TM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE NEED FOR ENVISIONTM August 2012

  2. Resource Depletion

  3. ASCE’s Report Card for America’s Infrastructure • 15 categories rated • Overall grade of D • $2.2 trillion • Ranked 23rdworldwide

  4. America’s Infrastructure Today

  5. Development vs. Impact

  6. The Future of Infrastructure

  7. EnvisionTM Is Uniquely Qualified to Address America’s Infrastructure • Envision™ applies to all civil infrastructure • Addresses design, planning, construction and maintenance • Applicable at any point in an infrastructure project's life cycle • Speaks to the triple bottom line: social, economic and environmental goals • Designed to keep pace with achanging concept of sustainability

  8. Why Was EnvisionTM Developed? • Current rating systems for infrastructure in the U.S. are sector specific • No U.S. system covers all aspects of infrastructure • Envision™ is designed to fill the gap

  9. Advantages Restore Whole System Design Reduce, reuse, recycle Phased development Adaptive Post-life Sustain Technology Advancement Performance Goals DRIVE TOWARD RESTORATIAVE PERFORMANCE Improve Improve Design Construct O&M Reuse Disassembly Conventional EXTEND THE USEFULNESS OF THE PROJECT Project team Owner organization Team Chartering Understand/Integrate Community Needs Deliver as Part of Owner Organization Partner with Regulators EXTENDPROJECTBOUNDARIES Affected stakeholders Partner organizations Regulatory bodies

  10. www.sustainableinfrastructure.org