Presented by: Michael Casal Tom Le Sean Yeung Minh Pham 11 Dec. 2009. Routing Study of Light Rail Extension to Everett. Picture: http://farm3.static.flickr.com/2476/3722296467_0ebc422d2e_o.jpg. Project goals/Design Requirements. Design Requirements Connect U-district station to Everett
E N D
Presented by: Michael Casal Tom Le Sean Yeung Minh Pham 11 Dec. 2009 Routing Study of Light Rail Extension to Everett Picture: http://farm3.static.flickr.com/2476/3722296467_0ebc422d2e_o.jpg
Project goals/Design Requirements • Design Requirements • Connect U-district station to Everett • Maximize • potential users • Minimize • Impacts to existing recreational infrastructure • Environmental impacts • Cost
Design factors • In order to achieve project restraints, data gathered for: • Grade • Wetlands • Population Density • Parks • Trails • Express stops (Light rail)
GIS Analysis Buffer Clips Erase Slope calculation Used constraints to narrow possible routes from U-district to Everett.
Recommendations • Option 1 • This minimizes changes to existing infrastructure, follows a low slope, and runs through locations where people come from/go to. • Option 2 • Fails to follow population density as well as Option 1. • Option 3 • Fails to follow low slope constraints.
Sources • Snohomish County GIS data<http://uwashington.worldcat.org/oclc/37441883&referer=brief_results> • King County GIS Data<https://wagda.lib.washington.edu/data/geography/wa_counties/king/index.html> • Sound Transit Express Bus Stops • <https://wagda.lib.washington.edu/data/geography/wa_counties/SoundTransit/index.html> • White House Logo • <http://www.wired.com/images_blogs/threatlevel/2009/05/us-whitehouse-logo.jpg>