1 / 8

Status report for revision of ISO 13628-6 (API 17F)

Status report for revision of ISO 13628-6 (API 17F). Winter meeting Houston January 2011. Target. The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009. (Status medio 2009)

Download Presentation

Status report for revision of ISO 13628-6 (API 17F)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status report for revision of ISO 13628-6 (API 17F) Winter meeting Houston January 2011

  2. Target • The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009. (Status medio 2009) • The task has been more comprehensive than first anticipated. The ambition now is to finalise the technical content within October 2010. (Status medio 2010) • Technical content will be finalised primo 2011

  3. Table of content to be as existing standard • System requirements • Surface equipment • Subsea equipment • Interfaces • Materials and fabrication • Quality • Testing • Marking, packaging, storage and shipping

  4. Modifications • General revision of text in document • Pressure definitions improved/clarified • Software development requirements included • Subsea processing covered • Horizontal integration covered • Statement related to SIL included • Cleanliness requirements revised • Annex C updated • Annex E revised • Annex F revised • Annex G revised • Annex H revised • EMC requirements will be revised

  5. ISO task group meetings • Kick off meeting in Oslo Norway October 2008 • Celle Germany February 2009 • Copenhagen Denmark June 2009 • London UK October 2009 • Asker Norway February 2010 • Bristol UK May 2010 • Aberdeen UK September 2010 • Oslo Norway January 2011 (Review of API comments)

  6. API working group meetings • January 2009 • June 2009 • January 2010 • May 2010 • November 2010 • Joint API / ISO meeting in Houston January 2011

  7. ISO task group participants Project leader Roald Loug Hansen, StatoilHydro, Norway, roloha@statoilhydro.com Members • Paul Thomas, Aker Solutions, UK, paul.thomas@akersolutions.com • Bruce Scott, Halliburton, , Bruce.Scott@Halliburton.com • Cristopher Curran, BP, USA, Christopher.Curran@bp.com • Frederico Nicoletti, Subsea 7, Brazil, frederico.nicoletti@subsea7.com • Gerhard Wilche, Cameron, Germany, gerhard.wilcke@c-a-m.com • Ian Kent, GE, UK, ian.kent@ge.com • Jesper Jacobsen, Dong Energy, Denmark, jesja2@dongenergy.com • John Bodine, Chevron, USA, john.bodine@chevron.com • Ken Ellis, SES, , ken.ellis@subseaengineeringsolutions.com • Mike Theobald, Maersk Oil, Denmark, Mike.Theobald@uk.bp.com • Stefan Knepper, Cameron, Germany, stefan.knepper@c-a-m.com • Svein Lilleland, FMC, Norway, Svein.Lilleland@fks.fmcti.com • Sverre Corneliussen, FMC, Norway, Sverre.Corneliussen@fks.fmcti.com • Trond Bertmand, StatoilHydro, Norway, trbert@statoilhydro.com • Werner Menz, Cameron, Germany, menzw@camerondiv.com • David Saul, BP, UK, • Jens-Henrik Neuenkirchen, StatoilHydro, Norway, jhn@statoilhydro.com

  8. Christopher Curran, BP Brian Skeels, FMC David Lansbury, FMC Jay Hursh, Aker Solutions John Allen, GE Vetco John Simon, Shell Mike Brashear, Chevron Lee Mitchell, Chevron Richard Barratt, GE Vetco Don Schlater, BP Jim Metzinger, Technip Butch Taggart, Murphy Al Williams, Dril-Quip Don Ogwude, CSI Jose D Baca ExxonMobil Lon Ngo, Dril-Quip Mark Marsalis, Dril-Quip Ryan Chladek, ExxonMobil API 17F working group

More Related