70 likes | 306 Views
Status report for revision of ISO 1328-6 (API 17F). Winter meeting Houston January 2010. Target. The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009 (statement from Denver meeting)
E N D
Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010
Target • The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009 (statement from Denver meeting) • The task has been more comprehensive than first anticipated. The ambition now is to finalise the technical content prior to our summer meeting. (comments received that this schedule may be to ambitious)
Table of content to be as existing standard • System requirements • Surface equipment • Subsea equipment • Interfaces • Materials and fabrication • Quality • Testing • Marking, packaging, storage and shipping
Modifications • General revision of text in document • Pressure definitions improved/clarified • Software development requirements included • Subsea processing covered • Horizontal integration covered • Statement related to SIL included • Cleanliness requirements revised • Annex C updated • Annex E revised • Annex F revised • Annex G revised • Annex H revised • EMC requirements will be revised
ISO task group meetings • Kick off meeting in Oslo Norway October 2008 • Celle Germany February 2009 • Copenhagen Denmark June 2009 • London UK October 2009 • Next meeting planned in Asker Norway February 2010 API working group meetings • January 2009 • June 2009 • Next meeting planned in January 2010
ISO task group participants Project leader Roald Loug Hansen, StatoilHydro, Norway, roloha@statoilhydro.com Members • Paul Thomas, Aker Solutions, UK, paul.thomas@akersolutions.com • Bruce Scott, Halliburton, , Bruce.Scott@Halliburton.com • Cristopher Curran, BP, USA, Christopher.Curran@bp.com • Frederico Nicoletti, Subsea 7, Brazil, frederico.nicoletti@subsea7.com • Gerhard Wilche, Cameron, Germany, gerhard.wilcke@c-a-m.com • Ian Kent, GE, UK, ian.kent@ge.com • Jesper Jacobsen, Dong Energy, Denmark, jesja2@dongenergy.com • John Bodine, Chevron, USA, john.bodine@chevron.com • Ken Ellis, SES, , ken.ellis@subseaengineeringsolutions.com • Mike Theobald, BP, UK, Mike.Theobald@uk.bp.com • Stefan Knepper, Cameron, Germany, stefan.knepper@c-a-m.com • Svein Lilleland, FMC, Norway, Svein.Lilleland@fks.fmcti.com • Sverre Corneliussen, FMC, Norway, Sverre.Corneliussen@fks.fmcti.com • Trond Bertmand, StatoilHydro, Norway, trbert@statoilhydro.com • Werner Menz, Cameron, Germany, menzw@camerondiv.com • Jens-Henrik Neuenkirchen, StatoilHydro, Norway, jhn@statoilhydro.com
Christopher Curran, BP Brian Skeels, FMC David Lansbury, FMC Jay Hursh, Aker Solutions John Allen, GE Vetco John Simon, Shell Mike Brashear, Chevron Lee Mitchell, Chevron Richard Barratt, GE Vetco Don Schlater, BP Jim Metzinger, Technip Butch Taggart, Murphy Al Williams, Dril-Quip Don Ogwude, CSI Jose D Baca ExxonMobil Lon Ngo, Dril-Quip Mark Marsalis, Dril-Quip Niels Fuehrer API 17F working group