120 likes | 323 Views
EUCOM FY10 / 11 JETP Requirements/Impacts. Mr. Thomas Hill. FY10 JETP Shortfall. Requirement: $49.3M JS Allocation: $35.9M ($13.4M shortfall) Planning Target: $40M* Planning Shortfall: $9.3M $4.1M for PAC-3 funded by CCIF
E N D
EUCOM FY10 / 11 JETP Requirements/Impacts Mr. Thomas Hill
FY10 JETP Shortfall • Requirement: $49.3M • JS Allocation: $35.9M ($13.4M shortfall) • Planning Target: $40M* • Planning Shortfall: $9.3M • $4.1M for PAC-3 funded by CCIF • * Planning Target: To prevent under-spending, historically plan ~10% over allocation due to canx’s & ability to get EOY $
Planning Assumptions • EUCOM leadership approved plan 15 July 09 • Prevents waste of similarly constrained SIF/CE2 funds • Manages expectations/prevents unfunded commitments • No discretional monies currently available from JS • Further cuts possible • Unprogrammed growth borne by OCE desiring growth
Recommendation Planning Target: $40M or less Allocation: $35.9M • $39.8M program • 1 cancellation; 18 streamlined Streamlined Exercises Recommended Cancellation
Potential Impacts • Potential risk to exercise program: • Significant • $4M in risk to maximize engagement • Relies on EOY monies/cancellations • 4th Qtr exercises at risk: • JACKAL STONE, MEDCEUR, COMBINED ENDEAVOR, NORTHERN VIKING, TORGAU, BOLD AVENGER • Sealift drives earlier CCD • Reduced flexibility/compressed JELC cycle • Increased political and financial risk • Impact to SAS & event objectives/readiness/BPC: • Minimal Moderate • Only one event cancelled • Limits STRATLIFT for ERC/HA/HCA projects
USEUCOM Strategic Objectives • 1 - USEUCOM forces transformed and expeditionary, trained and ready for global deployment, and prepared to execute joint/multinational operations and training. • 2 - NATO capable and willing to conduct out-of-area operations. • 3 - European partner nations and organizations work with USEUCOM to actively solve common problems. • 4 - Partner nations have capacity to provide own security and sustain regional stability. • 5 - Protection of Allies, Partners, and U.S. interests assured. • 6 - Basing and access support strategic freedom of action and security cooperation activities. • 7 - Russia acts as a responsible partner with the U.S., our Allies, and partners. • 8 - Local crises prevented from becoming regional conflicts Strategy for Active Security – 4 Jun 08
2009 USEUCOM JMETL • ST 1: Deploy, Concentrate, and Maneuver Theater Forces (ECJ3) • ST 2: Conduct Theater Strategic Intelligence, Surveillance, and Reconnaissance(ECJ2) • ST 4: Sustain Theater Forces (ECJ4) • ST 5: Provide Theater Strategic Command and Control, Communications, and Computers (C4)(ECJ6) • ST 5.4: Provide Strategic Direction to Theater Forces (ECJ5/8) • ST 6: Force Protection (ECJ3) • ST 6.6: Perform Mission Assurance (ECJ3) • ST 8: Develop and Maintain Alliance and Regional Relations (ECJ5) • ST 8.4.2: Combat Terrorism (ECJ3) • ST 8.5: Integrate Military Operations With Regional Interagency Activities (CIEG) • ST 9: Coordinate Counterproliferation in Theater (ECJ5)
Impacts (cont.) • JUNIPER COBRA: 12 hr ops • ISR prefers 24 hour battle rhythm • Strategic Objective (SO) 4; JMETS ST 3/5/6/6.6/8/9 • REGIONAL RESPONSE: no growth • Limits scope/complexity—no training of Mobile BN enablers (EN, NBC) • Potentially delays AZE NATO OCC Level II • CCP; SO 3/4/5; JMET ST 8 • Limits HA/HCA engagement • CCP; SO 3/4; JMET ST 8
Impacts (cont.) • NOBLE SHIRLEY: • 1 of 2 two FAST PLTs receive CT/FTX Training • Decreased readiness • SO 3/4; JMETS ST 8/8.4.2 • IMMEDIATE RESPONSE: SEABEE Det cancelled • Reduced HA/HCA/ERC support • SO 4/5/6/8; JMET ST 8 • ANATOLIAN FALCON • Costing assumes EUCOM forces; add’l $1.7M from CONUS • SO 1/3/4/6; JMETS ST 1/4/5/8
Impacts (cont.) • AUSTERE CHALLENGE: Reduced from $5.5 to $3.5M • Smaller JECG/White Cell/JTFs • Potentially limits JTF training and diminished readiness • SO 1/3; JMETS ST 1/2/4/5/5.4/8.5 • RAPID TRIDENT: No BN level and EN, NBC training • Limited support to NATO OCC Level I and II • CCP; SO 2/4/5/7; JMETS ST 8 • TORGAU: CPX only (placeholder) • SO 6/7; JMET ST 8
EUCOM Training Conferences –The Way Ahead FY10 FY11 FY12 FY13 FY14 FY15 FY16 ETSC (Dec 09) ETPC (Jun 10) • Joint Training Schedule • Event Specifications (5 W’s) • Forecast Budget Data • Link to SAS & CCP • Dates: 8 – 11 Dec 09 • Review & Validate FY11 • Create Plan for FY12 • ETSC - EUCOM Training Synchronization Conference (December) • ETPC - EUCOM Training Planning Conference (June)