1 / 12

Western States Power Corporation

Western States Power Corporation. Western States Power Corp. Total Funding : $660 Million (thru Sept 2016) By Purpose : Capital: $621 Million O&M: $21 Million PP&W: $18 Million. Western States Power Corp. By Agency : WAPA - $317 Million

roddy
Download Presentation

Western States Power Corporation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Western StatesPower Corporation

  2. Western States Power Corp. • Total Funding: $660 Million (thru Sept 2016) • By Purpose: • Capital: $621 Million • O&M: $21 Million • PP&W: $18 Million

  3. Western States Power Corp. • By Agency: • WAPA - $317 Million • Reclamation - $190 Million • Corps - $153 Million

  4. Western States Power Corp. • FY 2016: • Total Approved: $72.1 Million • (without Reprogramming) - $61.8 million in New Funds • Western (Reprogrammed Funds) $10.3 Million • Reclamation - $29.6 Million • Corps - $32.2 Million

  5. Western States Power Corp. • Western-UGP: • No New Funding Expected. Total Reprogramming Expected to be Approximately $9 Million • Likely Projects for 2017 include Jamestown Control Bldg., Brookings Sub. Stage 9, Towner Sub., Ft. Thompson Crew Bldg., and Newell Transformer • Expected to Use Keystone XL Advances or Other Carryover funds from Completed Projects.

  6. Western States Power Corp. • Western-RMR: • No New Funding Expected for FY 2017. Reprogramming Amounts Are Uncertain • Construction for Already-Funded Projects Expected to Take Place – Estes-Flatiron 115kV & Granby-Windy Gap 69kV Rebuilds • Possible New Projects for Reprogramming – Big George-North Cody Conversion, Alliance Dunlap 115kV Rebuild, and Badwater Reactors – Approx. $10 Million

  7. Western States Power Corp. • Bureau of Reclamation: • Top Projects for 2017 – Approx. $24 Million • Mount Elbert Rehabilitation - $20.2 Million • Guernsey Intake Gate Rehab. - $2.7 Million • Green Mtn. Penstock Re-line - $310 Thousand (out of $14 million total) • Yellowtail Afterbay Sluiceway Re-coat - $381 Thousand

  8. Western States Power Corp. • Key Projects – Corps of Engineers: • Major Projects for 2017–Approx. $10 Million • Gavins Point-Excitation and Governor Upgrades • Garrison – Repair Intake Crane/Design Intake Valves • Replace Programmable Logic Controllers at Gavins Point/Oahe/Fort Randall • Oahe – Intake Motor Controls/Design Outside S.S. Switchgear • Fort Randall – Replace Neutral Breakers/Design Intake Crane Replacement

  9. Western States Power Corp. • (Continued) • Key Projects – Corps of Engineers: • Pre-funding in 2017 for Corps Major Rehab. at Fort Randall Powerplant – Approx. $44 Million • Design Work Planned for 2017/2018 • Major Awards Starting in 2021

  10. Western States Power Corp. • (Continued) • Key Projects – Corps of Engineers: • Total Funding Request- FY 2017 - $54 Million • Meeting on July 25th in Sioux Falls with Corps, WAPA-UGP, and WSPC Board

  11. Western States Power Corp.

  12. Western States Power Corp.

More Related