Prioritization of VC HP Measures. Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting. Prioritization Overview. Roadmapping generated a list of over 30 VC HP applications, which were screened for the 5 highest priority measures.

rosie
Download Presentation

Prioritization of VC HP Measures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prioritization of VC HP Measures Variable Capacity Heat Pump Measure RTF Sub-Committee June 22, 2011 meeting

  2. Prioritization Overview • Roadmapping generated a list of over 30 VC HP applications, which were screened for the 5 highest priority measures. • These 5 measures were further evaluated in this prioritization. • Questions were sent to over 20 people and 11 responses were received. • The prioritization consisted of four questions, evaluating: • Expected savings potential for each measure; • Payback periods for each measure; • Capture measure specific drivers • Capture measure specific barriers. • . 2

  3. Top Five VC HP Measures 1) Install a DHP mini split, replacing electric resistance heat without any air conditioning for a commercial application in a converted house. 2) Install DHP mini splits insmall retail (less than 20,000 SF), conditioned by split-system heat pumps. 3) Install a VRF multi split-system in a small or medium office (less than 100,000 SF), replacing the existing rooftop heat pumps or air conditioning units with a energy-recovery-ventilator (ERV). 4) Install a VRF multi split-system with heat recovery capabilityin asmall or medium office (less than 100,000 SF), conditioned by multiple air-source heat pumps or air conditioning units with electric heat. 5) Install a VRF multi split-system with heat recovery capabilityin any commercial building with constant heat source, such as a data center, replacing electric heat. 3

  4. Evaluation Results - By Score VC HP Measure Scores 4

  5. Ranked VC HP Measure Scores 1 Ranked as the best within the corresponding criteria 2 Ranked as the second best within the corresponding criteria

  6. Measure Specific Drivers 6

  7. Measure Specific Barriers 7

  8. Discuss Other Approaches for VC HP Measures • Upstream incentives • Equipment incentives based on EER • Whole building performance incentives • Other 8