80 likes | 165 Views
Status of Torino-Dubna Production. Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers= 48 MB1 + 54 MB2+ 50 MB3+ 41 MB4).
E N D
Status of Torino-Dubna Production • Aluminum Plates production: • Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1 +54MB2+50MB3+41MB4). • Dubna: steady production ongoing. Plates for 34 MB1, 40 MB2, 39 MB3, 3 MB4 produced insofar (116 total). Time estimated to complete full production + spares march 2005 (as specified in the contract). amedeo.staiano@to.infn.it
Status of Torino-Dubna Production Position Quality of strip production: stable since change of strip deposition head in august 2002. Plate MB1 n. 300220 1 pixel = 0.106mm amedeo.staiano@to.infn.it
Status of Torino-Dubna Production HV test performance of strip production: Plates which pass 1st HV test 84% Last plate of the day left under HV test during the night, 10 hours. No extra bad plates found so far. amedeo.staiano@to.infn.it
Status of MB4 Production Preparation • Production of FE and HV SL frames ongoing in Torino. 20 MB4 HV side + 9 FE side frames produced. amedeo.staiano@to.infn.it
Status of MB4 Production Preparation Plotter Y axis supports 99% ready for table installation. Completion expected by delivery of last part (rails protective tape fixations). amedeo.staiano@to.infn.it
Status of MB4 Production Preparation I beam tool drawings (P.Mereu) Inflatable tube (2.5m,f=7.5mm) Elastic rubber OPEN 12.7 mm ALCOA support Commercial profile CLOSED amedeo.staiano@to.infn.it
Status of MB4 Production Preparation Final prototype executive drawings ready Movable locating block Rails Torsion springs amedeo.staiano@to.infn.it
Status of MB4 Production Preparation Main Structure: Rohacell Sandwich Thickness 500mm Load 5000N amedeo.staiano@to.infn.it