360 likes | 373 Views
SOI-ASIA is a project that enables the sharing of lectures across Asia through a multicast and satellite network. It promotes collaborative learning and real-time interaction among partner institutions. The project also includes workshops, seminars, and interactive discussions on various topics.
E N D
UDLR in AsiaNow 9Mbps Jun Murai WIDE Project KEIO University
UDL segment DTCP UDLR Feed UDLR Recv FBIP FUIP RUIP fu ru Feed Router Recv Router fb rb Internet GRE Tunnel
UDLセグメント UDLR Feed UDL Recv Feed Router Recv Router Recvセグメント Feedセグメント RS RT Internet GRE tunnel Server
JCSAT-3 (128deg E) C-Band Global Beam IOIT (Vietnam) USM (Malaysia) ASTI (Philippine) Temasek Poly (Singapore) SFC (Japan) Current point-to-point partners (送受信局) UDLR partners (受信専用局) 地上系Internet
WG設立 フェーズ Tunneling 方式 仕様検討 フェーズ 文書化 フェーズ AD/IESG レビューフェーズ Proposed Standard RFC(RFC3077) 6 5 方式比較 検討フェーズ 4 3 2 凡例 1 IESG Lastcall AD,IESG Comment 0 0 UDLR-Internet-Draft WG Lastcall 36 UDLR WG 本会議開催 WG設立 BoF開催 BoF開催 IETF 36 37 38 39 40 41 42 43 44 45 46 47 48 49 8 12 4 8 12 4 8 12 4 8 12 4 8 12 4 1996 1997 1998 1999 2000 2001
Multicast over UDL S A’ × 受理しない IGMP (受信者の報告) 最短経路 R A MR 受理する 転送するorしない RPFによる転送制御 IGMPによる転送制御
JCSAT-1B/Ku JCSAT-3/C UDL from SFC UDL Return p2p UDL p2p p2p IOIT ASTI USM NAIST AIT ITB SFC Temasek C band RO C band RO C band RO (7局) Internet
Gateway Site (SFC) WHAT?Sharing of Lectures – realtime and archive Asian Partner Sites Relaying lectures through SFC to allasian partners using multicast and satellite Participating in the lectures at thePartner Institutions The Internet SOI Mirror Server Giving Lectures from sites with wide network LAN Giving Lectures from sites any place on the Internet (Japan, US and so on) SOI ContentsMirroring Learn through partner’s local mirror server
SOI-ASIA Partners Satellite Antenna SOI-ASIA Partners Satellite Antenna Brawijaya University, Indonesia Hasanuddin University, Indonesia Sam Ratulangi University, Indonesia Laos National University, Laos University of Computer Studies, Yangon, Myanmar Asian Youth Fellowship, Malaysia Institute of InformationTechnology,Vietnam Asian Institute of Technology, Thailand Chulalonkorn University, Thailand
HOW ?SOI Asia Site Network Configuration Provided by SOI Asia Project Prepared by Institution Terrestrial Internet JCSAT-3 C-Band C-7 transponder CampusLAN SOI Server Receive Router SOI Clients IF Coaxial Cable L-Band (950 - 1450MHz) LAN AC power supply UDLR Receiver
Project Milestones • Stage I – Establish the partnership and network infrasutrcuture • Stage II – Pilot Programs • Stage III – More Interactive Programs in non-IT • Stage IV – More sustainable and autonomous operation • Stage V – Utilizing for the university programs • “Advanced Internet Technology” by WIDE Project • Master course level • Assignments and evaluation • Research proposal and joint research in Japan (short visit) • Formalization • Guidelines and Documentations • Course planning
Lectures shared with SOI Asia Partners • IT and Social Science • 8 lectures by KEIO University • June ~ July 2002 • Certificate Ceremony on 30 July • Advanced Topics for Fisheries and Marine Science • 4 lectures by Tokyo University of Fishery • September 2002 • Special Seminar : E-learning of IT Economics • September 27th 2002 from • Advanced Internet Technology • 16 lectures by WIDE project • Nov2002 ~ Jan2003 • Certificate Ceremony on 26 March 2003 • SOI Asia Special Lecture "Introduction to reactive fluid dynamics“ • Prof. Toshihirsa Ueda / Keio University • April 29th, 2003 • Advanced Topics for Fisheries and Marine Science II • 「日本魚病学会」より 4授業 • November 2003
Events and Workshop on SOI Asia • E-Government Conference in Indonesia • October 2002, shared by all partners • Realtime ASEAN Interaction • Myanmar, Thailand, Japan • February 20th 2003 • Operators Workshop 2002 Summer • August 30 – Sept 5 at SFC Japan • 21 participants from 7 countries • Operators Workshop 2003 Spring • Feb 17 – Feb 26 at AIT, Bangkok • 21 participants from 7 counties • Interactive Discussion on interactive distance education • July 2nd with 7 participating sites at MeSci • Keynote from Japan for Brawijaya University 40th Anniversary • October 2003 from KEIO Univ and NAIST
Ceremony on the InternetJuly 30th, 2002 Student representative’s speech from Indonesia Brawijaya Univ. Participants from Thailand Participants fromother universities in Indonesia, Malaysia Japanese Professors
Feb 20th ,2003 2 hourse Realtime discussion among AIT, Thailand UCSY, Myanmar KEIO Univ, Japan Topics: HRD using IT Webcasting to worldwide ASEAN Realtime SessionASEAN-JAPAN Exchange Year 2003
Interactive Discussion on “Interactive Distance Education” July 2nd 2003 Participants from; KEIO, Japan UCSY, Myanmar ASTI, Philippine ITB, Indonesia AFY, Malaysia NUOL, Laos
Other progresses • Sustainability and stability • Documentation are prepared • Network monitoring system is improved • Better Planning • Scheme is re-formed by partner sites • Steering Committee (monthly tele-conf) • Academic Committee • Research Committee • Operators Committee • Advanced Usage • SOI Asia Coursed used for selecting research interns going to Japan • 240 students participated the course, 42 students got the certificates, 3 are selected as candidates.
Summary – SOI Asia Project • Established a strong partnership among 9 institutions in 5 countries. • Established the sustainable and autonomous environment by skilled and motivated people at each site for global sharing of educational resource. • Ready for the University programs; • Use as a part of “Sandwich” program. • More courses in various fields for partners. • Lectures by Partners themselves. • Lectures archive in the local Languages
2004 Plans : 4 university courses • Advanced Internet Technology course II : Internet operation • April – May, October – November • Intensive Course for all internet operators • Mr. Kato / WIDE project will lead the planning • Fisheries • Regular Course for accreditaion • September – October • Tokyo University of Fisheries will lead the planning • Bio-Tech bio tech/bio informatics • Intensive Course for graduate student • February – March (Year 2004) • February – March (Year 2003) if possible • Engineering • Regular Course for LAO Master course pilot program • June – August
2004 Plans : Events / Meetings • Special Seminars of the Social Science • Series of Lectures by Nobel prized researchers from AIT/CHULA (Thailand) • ITB August new student event • Events • August 2004 • Special sessions for AYF • Meetings for the matching process (Spring) • Meetings for the preparation process (Fall )
Current AI3 Ku-Band Frequency Allocation 5.65MHz 10 11 12 13 14 15 16 17 18 478KG7W (512kbps) AIT ↓ NAIST 1M44G7W (1536kbps) ITB ↓ NAIST NAIST transmit ITB transmit AIT transmit 478KG7W (512kbps) NAIST reserve 1M92G7W (2048kbps) NAIST ↓ ITB 1M44G7W (1536kbps) NAIST ↓ AIT
New AI3 Ku-Band Frequency Allocation 7.70MHz 10 11 12 13 14 15 16 17 18 1M92G7W (2048kbps) AIT ↓ NAIST 1M92G7W (2048kbps) ITB ↓ NAIST NAIST transmit ITB transmit AIT transmit 1M92G7W (2048kbps) NAIST ↓ ITB 1M92G7W (2048kbps) NAIST ↓ AIT
Current AI3 C-Band Frequency Allocation 14.4MHz -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 394KG7W (512kbps) VN ↓ SFC 394KG7W (512kbps) SG ↓ SFC 394KG7W (512kbps) MY ↓ SFC 197KG7W (128kbps) Laos ↓ SFC 394KG7W (512kbps) PH ↓ SFC SFC transmit VN transmit PH transmit SG transmit 6M40G7W (6600kbps) SFC ↓ UDL 197KG7W (128kbps) SFC ↓ Laos 1M19G7W (1536kbps) SFC ↓ PH 1M19G7W (1536kbps) SFC ↓ VN 1M19G7W (1536kbps) SFC ↓ MY 1M19G7W (1536kbps) SFC ↓ SG MY transmit Laos transmit
New AI3 C-Band Frequency Allocation 18MHz • When more than 3 197KG7W carriers are transmitted from SFC, the SFC license need to be changed. -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 394KG7W (512kbps) VN ↓ SFC 394KG7W (512kbps) SG ↓ SFC 394KG7W (512kbps) MY ↓ SFC 394KG7W (512kbps) PH ↓ SFC 197KG7W (128kbps) Laos ↓ SFC SFC transmit VN transmit PH transmit SG transmit 9M40G7W (9690kbps) SFC ↓ UDL 197KG7W (128kbps) SFC ↓ Laos 1M19G7W (1536kbps) SFC ↓ VN 1M19G7W (1536kbps) SFC ↓ MY 1M19G7W (1536kbps) SFC ↓ SG 1M19G7W (1536kbps) SFC ↓ PH MY transmit Laos transmit
UAT Schedule adjustment • All sites are affected due to this change. • SFC needs some measurement before parameter change, so that all SFC carrier will stop 1 day. • Basic policy • Ku-Band and C-Band UAT goes independently. • Both C and Ku band changes takes a day. • When stopping the carrier and UAT , please call to YSCC. • I will prepare the table including frequency, symbol rate and carrier type information, then I will send the web location of it to you using “ai3-ix@ai3.net”.
Ku-Band UAT Time Schedule • Related Site • NAIST, ITB, AIT • Procedure Outline • AIT -> NAIST and NAIST->AIT changes • ITB -> NAIST and NAIST receive change in parallel. • Let’s fix the changing date (10/10) • 10/10 11:00~13:00 JST (9:00~11:00 @AIT) • AIT will stop and start to transmit after parameter change. • NAIST will confirm the receiving carriers. • NAIST will stop and start to transmit after parameter change. • AIT will confirm the receiving carriers. • 10/10 16:00~18:00 JST (14:00~16:00@ITB) • ITB will stop and start to transmit after parameter change. • NAIST will confirm the receiving carriers.
C-Band UAT Time Schedule • Related Site • SFC , PH , Laos , All UDL RO site , MY , VN , SG • Procedure Outline • PH->SFC,SFC->PH and Laos->SFC, SFC->Laos change. (Step-1) • All SFC carriers stop and do some measurement. (Step-2) • All SFC carriers start to transmit after parameter changes. (Step-3) • Let’s fix the SFC measurement date (11/14) • 11/14 10:00~12:00 JST (8:00~10:00@Laos ; 9:00~11:00@PH) • PH->SFC and Laos->SFC will stop and start to transmit after parameters change. • SFC confirm the receiving carriers. • SFC->PH and SFC->Laos will stop and start to transmit after parameters change. • PH, Laos will confirm the receiving carriers. • 11/14 13:00~17:00 JST (11:00~15:00@Laos,VN ; 12:00~16:00@SG,MY,PH) • SFC will stop all carriers, and do some measurement and transmit carriers after parameter change. • 11/14 18:00~ JST (16:00~@Laos,VN ; 17:00~@SG,MY,PH) PH,Laos, MY, VN, SG, all RO site will confirm the receiving SFC carriers.
Step-1SFC->PH , PH->SFC , SFC->Laos , Laos->SFCchange -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 SFC transmit VN transmit PH transmit SG transmit MY transmit SFC->PH and PH->SFC change SFC->Laos and Laos->SFC change Laos transmit
Step-2All SFC carriers will stop,and do some measurement. -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 SFC transmit VN transmit PH transmit SG transmit MY transmit Laos transmit
Step-3All SFC carriers will transmit after parameter chage. 18MHz -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 394KG7W (512kbps) VN ↓ SFC 394KG7W (512kbps) SG ↓ SFC 394KG7W (512kbps) MY ↓ SFC 394KG7W (512kbps) PH ↓ SFC 197KG7W (128kbps) Laos ↓ SFC SFC transmit VN transmit PH transmit SG transmit 9M40G7W (9690kbps) SFC ↓ UDL 197KG7W (128kbps) SFC ↓ Laos 1M19G7W (1536kbps) SFC ↓ VN 1M19G7W (1536kbps) SFC ↓ MY 1M19G7W (1536kbps) SFC ↓ SG 1M19G7W (1536kbps) SFC ↓ PH MY transmit Laos transmit
Contact • soi-asia@soi.wide.ad.jp • http://www.soi.wide.ad.jp/soi-asia/
Date of change for Ku-Band 10/A Date of change for C-Band 10/B We decided the date of changesas below.