1 / 4

Planning to develop the CIS Work Programme 2010-2012

This document outlines the planning process for the CIS Work Programme 2010-2012 discussed during the Strategic Coordination Group Meeting in March 2009. It highlights the importance of simplification, cross-sectoral discussions, and the involvement of river basin authorities and experts in addressing water and biodiversity issues. The timetable for working group meetings and the endorsement of the work programme are also provided.

rubywdavis
Download Presentation

Planning to develop the CIS Work Programme 2010-2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning to develop the CIS Work Programme 2010-2012 Meeting of the WFD Strategic Co-ordination Group 11 March 2009 Jorge Rodriguez Romero European Commission, DG Environment Unit D.2 – Water and Marine, WFD Team

  2. Orientation debate held by Water Directors in Paris November 2008 based on a paper presented by the troika (FR/CZ/SE) Conclusions (extract) Principles remain valid Simplification of structures Combination of strategic, cross-sectoral discussion fed by technical elements Pragmatism Reinforce dissemination to the wider public Continuation agriculture, climate change, links to renewable energy policy Strategic issues: links between water and biodiversity, marine environment Importance of Commission involvement at all levels Encourage involvement of river basin authorities and experts from national and international (e.g. river conventions) Links to other international water initiatives Background

  3. Calendar of working groups 18-19 March WG E Priority Substances 19 March SSG WFD and Agriculture 30-31 March WG D Reporting 20-21 April WG A Ecostat 27-28 April WG C Groundwater 29-30 April SSG on Climate Change and Water 19-20 May WG F Floods 07-08 May SCG & Art 21 Committee Extended agenda point on proposals for activities from WG 28-29 May Water Directors Report to Water Directors October-November: finalisation of mandates WG and SCG Endorsement of the CIS Work Programme 2010-2012 by WD in Malmö Time table

  4. The SCG is invited to • Ask Working Groups leads to • schedule an agenda point in their respective spring meetings to discuss the potential tasks for Work Programme 2010-2012 • Prepare a first outline of the mandate for the May meeting of the SCG • Prepare to take the comments back to autumn meetings of the WG and prepare final drafts for the SCG meeting of October or November

More Related