130 likes | 248 Views
IMK-IFU. WRI. ISSER. UHOH. IFPRI. White Volta Basin Sub-Project. Use cases:. In consultation with Ministry of Food and Agriculture and the Water Resources Commission, Modeling Workshop in Jan. 2006, Evaluating third cropping season strategy,
E N D
IMK-IFU WRI ISSER UHOH IFPRI
Use cases: • In consultation with Ministry of Food and Agriculture and the Water Resources Commission, • Modeling Workshop in Jan. 2006, • Evaluating third cropping season strategy, • Evaluating the impact of Credit Market Reforms,
Modeling: • MAS:Optimization component: • New household survey not enough for input-output estimation, • Started with old Matrix, • Representing the third cropping season (maize) a challenge: • New proposal and no household level data, • MoFA did experiments but no recorded data, • Alternative CropWat, FAO report and data from case farmers visited during different survey times.
2. Hydrological model: -WaSiM-ETH Model for Atankwidi subcatchment, - 12 months modeling period (01.01.2004 to 31.12.2004), - validation done by one year runoff data “Kandiga Junction”, • simulation run with a spatial resolution of 100m and a daily temporal resolution, • the simulation included fictive reservoir and a fictive irrigation field,
1 V o l t a _ e p p + l i n . s h p - The major challenge we have now is synchronizing the geo-references of the socio-economic surveys and the hydrological data. It looks there scaling problem between the two.