1 / 41

IFU Management Meeting

IFU Management Meeting. LAM – 15/10/04. Introduction (olf). Recall of the development History (Olf). Pour info – coût prototype: ~6 my : 360k€ Vacuum chambers; vibration tools: ??? ~150k€ hardware Test equipment: ~30k€ Travel: ? Total: ~600k€ (ESA funding : ~300k€).

kordell
Download Presentation

IFU Management Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IFU Management Meeting LAM – 15/10/04

  2. Introduction (olf)

  3. Recall of the development History (Olf) • Pour info – coût prototype: • ~6 my : 360k€ • Vacuum chambers; vibration tools: ??? • ~150k€ hardware • Test equipment: ~30k€ • Travel: ? • Total: ~600k€ (ESA funding : ~300k€)

  4. Lessons Learned from the prototype development • R&T development spirit of LAM Team where the contract was more fly hardware delivery type ( ESA did not refocus during the study) • Small experience in structural dynamic analysis • CNRS difficulties to manage industrial kind of contract • Laboratory has no autonomy • The prototype is finished and the core technology is validated

  5. How to move for the NIRSPEC-IFU development • Needs of phase B/C/D industrial management type • Needs of high level reference support for dynamical analysis study • CNRS administration constraint not adapted for industrial sub-contract • Refocusing on our core activities

  6. 4 1 3 2 Slicer Principle How to rearrange 2D field to enter spectrograph slit: • Field divided by slicing mirrors in subfields telescope pupil on the pupil mirrors • Aligned pupil mirrors • Sub-field imaged along an entrance slit Courtesy: JR Allington Smith

  7. Slicer unit optical design for the IFS Slit Mirrors Pupil mirrors Slicer mirror Entrance Pupil

  8. Slicer unit optical design for the IFS • Radius of curvature: ~ 150 mm • Tilt in Y: +/- 3.7° • Tilt in X: from 3.3 to 9° • Thickness: 900 µm • Width: 27 mm

  9. Slicer unit optical design for the IFS: pupil mirror 300µm • Pupil mirror pitch: 2.754 mm • Pupil oversizing in spectrograph: <2 • Tilt Y: +/- 3.7° • Tilt X: 3.65° –> 6° • Curvature Radius: ~24.5mm

  10. Slicer unit optical design for the IFS: slit mirror 500µm • Pitch: 2.754 mm • Curv. radius: 26.5 mm • Tilt Y: 0° • Tilt X: 6.5°

  11. Pupil mirror array Dummy Stack Slit mirror array Active Stack Heel Stacksupport Thrust cylinders Substructure Steeringmirror Main structure Design Overview

  12. The prototype as built

  13. Clamp Slicer Stack 2 Dummy slices 10 Active slices 18 dummy slices Clamps

  14. Mirrors lines

  15. Tests

  16. Results Highlights

  17. Manufacture and integration

  18. Ensquared energy

  19. Crosstalk +/-40µm relative for a specification of +/- 120µm

  20. Slits separation Plots of the intensity profiles in the regions between the pseudo-slits. Lowest contour in the plots corresponds roughly to ~1% of the peak intensity (50 for a peak intensity of ~3000).

  21. Lessons

  22. Prototype critical points

  23. Prototype critical points

  24. ESA ASTRIUM concern • ESA and Astrium presentation

  25. Technical Baseline (PeB/PD/JLB)

  26. Industrial Team (Olf)

  27. WBS (ASTRIUM)

  28. Share of work and responsibilities

  29. Related Experience (Olf)

  30. LAM Project Team (Olf)

  31. Design & development approach • Phase B: • Design • Analysis (optical performance, stray light analysis, structural static and dynamic, thermal) • Test Plan preparation • Technological development: • 30+3 optical bonding release (for statistical approach) • 30+3 Hydroxil bonding release • 40 slices stack with optical bonding (vibration, thermal, shock) • 40 slices stack with Hydroxil bonding (“”) • Opto-mechanical mount for pupil lines (thermal, vibration, shock) • Opto-mechanical mount for flat folding mirror (thermal, vibration, shock)

  32. Design & development approach • Phase C/D: • STM: for dynamical model calibration, opto-mechanical demonstrator verification, and delivery at Astrium • EQM: end to end optically functional for 9 channels, structural fully representative, interface representative; qualification in vibration, optical performance at operating temperature, thermal cycling, and shock • FM: Environmental tests at acceptance level, acceptance optical test at operation temperature, characterization at operating temperature

  33. Model Philosophy

  34. Technology development plan • 33 samples of pupil mirrors optical bonded: • 33 acceptance tests • 33 cryo cycling (22°K) • 30 tests up to release at atmosphere pressure • 3 tests up to release in vacuum • 33 samples of pupil mirrors hydroxil bonded: • 33 acceptance tests • 33 cryo cycling (22°K) • 30 tests up to release at atmosphere pressure • 3 tests up to release in vacuum

  35. Technology development plan • 40 slices stack optical bonded: • 15 thermal cycling (survival - IFU-284) • Vibration qualification tests (survival - specification?) • Shock tests (survival - specifications?) • 40 slices stack hydroxil bonded: • 15 thermal cycling (survival - IFU-284) • Vibration qualification tests (survival - specification?) • Shock tests (survival - specifications?)

  36. Technology development plan • Opto mechanical mount of pupil mirror lines on INVAR: • Representative zerodur support (similar mass than support plus pupil mirror) • Opto-mechanical mount (representative) • Vibration test (survival - specifications?) • Thermal cycling (survival - IFU-284) • Shock test (survival - specifications?) • Opto mechanical mount of folding mirror: • Representative element • Opto-mechanical mount (representative) • Vibration test (survival - specifications?) • Thermal cycling (survival - IFU-284) • Shock test (survival - specifications?)

  37. Product Breakdown / procurement approach • Image slicer: • Slicer unit + pupil line + slit line • No opto-mechanical mount • Test structure for acceptance @RT • Folding mirror: • Mirror plus opto-mechanical mount • Test acceptance @RT and @OP • Toroidal mirrors: • Two mirrors together • Optomechanical mount • Test structure for acceptance @RT • Structure: • STM: refurbishing after tests • EQM + FM + Spare: to the same company

  38. Verification approach • Sub system acceptance: • Slicer, mirror lines: vibration (level?) + thermal cycling • Folding mirror + mount: vibration (level?) + thermal cycling + flatness @OP • Toroidal mirrors: optical performances mounted together @RT • Slicer + pupil +slit: optical performance together @RT

  39. Verification approach • EQM:

  40. Verification approach • FM:

  41. Planning • KO: Nov 30th • PDR: Sept 05 • … a remplir avec le SOW que j’ai pas… michel?