ESPI System Measurements of Thermo-mechanical Prototype. Cold Box, ESPI system, Cooling in place Base-plate, dial gauges,.. ‘close’ All parts manufactured (plates) Dial gauges problematic – earthquake may adapt to use different design Programme. Cooling System - tested. ESPI, Box
E N D
ESPI System Measurements of Thermo-mechanical Prototype • Cold Box, ESPI system, Cooling in place • Base-plate, dial gauges,.. ‘close’ • All parts manufactured (plates) • Dial gauges problematic – earthquake may adapt to use different design • Programme
Cooling System - tested ESPI, Box Changed to free space Tested, but not recently Remaining problems with CF surface
Programme • Understand Base Plate • Al blank with dial guages • Al blank with ESPI • Glass blank with ESPI & gauges • Thermo-mechanical no powder • Measure with gauges • Reproduce RAL results • No module power • With module power • Q? repeat temp measurements? • Note different orientation • Q? Experiment with mounting ? • Check no further use for T-M module • Spray with powder • ESPI • Environmental Cool • Active Cooling • Active Cooling + module power • Odd power configurations • Different mounting schemes.
Schedule • This will not be a ‘fast’ thing • RAL Measurements exist. • No purpose to ‘quick’ results • Understand base plate, new cooling,… • Confirm, understand existing measurements • Different mounting arrangements • Conjecture 2-3 months • Alterative mounting + 1 month • Switch to ESPI + 1 month • Programme is probably ~6months From when the replacement dial gauges available