10 likes | 85 Views
Water Supply Major project components. Intake channel ( 2000 MLD) Intake PS ( 2000 MLD) Intake pumps Ph-1: 525 MLD Raw water pipeline to WTP Ph-1: ( 525 MLD) Treated water pipes to Dhaka ( 500 MLD) 33kV power supplies (Phase 1) Stand-by power (Phase 1) Transformers (Phase 1)
E N D
Water Supply • Major project components • Intake channel (2000 MLD) • Intake PS (2000 MLD) • Intake pumps Ph-1: 525 MLD • Raw water pipeline to WTP Ph-1: (525 MLD) • Treated water pipes to Dhaka (500 MLD) • 33kV power supplies (Phase 1) • Stand-by power (Phase 1) • Transformers (Phase 1) • 31m wide corridor Intake ~ Dhaka Sylhet Road (Both for Saidabad & GWTP)