An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTEGRATED DESIGN SYSTEM • AUTOCAD • STAAD • STR. DESIGN SYSTEM • MICRO SOFT EXCEL

  2. S&R Consultants, Kerala, India Structural Design & Detailing Software (SDD) 28/ 3545 Chilavanoor road, Devi View, Elamkulam, Kochi 20, Ernakulam, Kerala, India 9846026162 Email: srconsultants@eth.net Web: www.sandrconsultants.com

  3. WORK FLOW

  4. Contents • Slab • Beam • Column • Footing • Combined Footing • Pile • Pile Cap • DMC & Under Reamed Pile

  5. WORK FLOW BREAK DOWN • AUTOCAD ARCH • SLAB DETAILING • STAAD INPUT • STAAD FILE EDITING • STAAD TO SDS • SDS TO AUTOCAD • SDS TO BAR BENDING MODULE TO EXCEL

  6. AutoCAD Database Excel Integration of Software

  7. Design AutoCAD Frame Analysis Integration of Methods

  8. SlabSectionDesign

  9. SlabAnalysis

  10. BeamSectionDesign

  11. Footing

  12. Footing-Design

  13. Pile1

  14. Pile2

  15. Pile3

  16. Tbeam

  17. Column1

  18. Column2

  19. Retaining Wall

  20. Steel2

  21. Advantage of BBS system • Acute bending can cause failure in high strength Fe 500 bars. Bar bending schedules and bar bending as per schedule is recommended to avoid the above problem. Fe 500 saves 10% compared to Fe 415 steel used presently. • Reduce cutting wastage, as certain steel suppliers can give you exactly the same length required. (5%). Also as the exact length of the bars are provided the workers making an error in the cutting is also reduced. • Better quality control at site • Better Estimation of steel • Real time estimation data, with the design • Better control on stock of steel actually required

  22. Advantage of BBS … • Economical order quantity or better project management or bench marking • Optimize your design based on the quantity of steel. • Steel bending and cutting can commence even before the form work is done • Steel bending can be done at a separate site, marked and then can be assembled at site • Project time can be reduced • What you see in the drawing is what you get at the site • With a quality data set, other management softwares can work on it. • A paper less office concept in the construction industry and associated advantages. • Total length of bars calculated is using Engineering formula • Mechanization of bending and cutting is possible. (Cut and bend systems) Reduces labour and time but increases the reliability. • Reduction in column and other member sizes