90 likes | 198 Views
Integrated Energy Design. Presentation of the IEE – INTEND project Green and Connected Cities. Strasbourg 10. December 2009. Mr. Per F. Jørgensen Senior partner KanEnergi AS. KanEnergi AS, Hoffsvn.13, N-0275 Oslo, tel: +47 22065750. www.kanenergi.com.
E N D
Integrated Energy Design Presentationofthe IEE – INTEND project Green and ConnectedCities • Strasbourg 10. December 2009 • Mr. Per F. Jørgensen Senior partner KanEnergi AS KanEnergi AS, Hoffsvn.13, N-0275 Oslo, tel: +47 22065750. www.kanenergi.com Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
The INTEND project2007-2009 Supported by • Partners: • KanEnergi AS coordinator - NO • Green Building Alliance – NO • Esbensen ConsultingEngineers AS – DK • Engineering College of Aarhus – DK • NAPE – PL • London Metropolitan University – UK • University of Athens – GR • Austrian Energy Agency - AT Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
VisionoftheINTENDproject • To develop Integrated Energy Design (IED) as a standard European practice of building design • and set a standard, which is substantially beyond the level of the Directive of Energy Performance of Buildings (EPBD) Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
What is INTEND ? European projectsupported by IEE INTegratedEnergy Design in publicbuildings Target group: thewhole building sector The methodedescribed in thedeveloped guideline is alsosuitable for sustainable urban planning Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
Why IED? Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
Main resultsoftheINTENDproject • 14 ”IED”-buildings in Europe • Guidelines ofIED • European database ofsustainableprojectswww.ecoarchwiki.net • Information and trainingofcore target groups • International conferenceon IED More info at www.intendesign.com Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
to be downloaded at www.intendesign.com The guideline – 9 steps STEP 1 - select a multi-disaplinary design team from day 1 STEP 2 - analyse theboundaryconditions STEP 3 - make a Quality Assurance Program and qualitycontrol plan STEP 4 - arrange a kick-off workshop STEP 5 - facilitateclosecooperationwithinthe design team STEP 6 - updatethecontol plan and documenttheenergyperformence STEP 7 - make contracts that encourage energy efficiency STEP 8 - motivate and educate construction workers and apply quality tests STEP 9 - make a user manual of operation and maintenance Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU
Thankyou for yourattention! • pfj@kanenergi.no • www.intendesign.com Rådgivere. Energi & miljø. Strategi. Forretningsutvikling. FoU