All Experimenters’ Meeting. September 02, 2013. Machine Status. Proton Source Commissioning and Studies Main Injector MI30 vacuum work completed Beam returned to MI on Wednesday MI back-fed from Master Sub-Station
E N D
All Experimenters’ Meeting September 02, 2013
Machine Status • Proton Source Commissioning and Studies • Main Injector • MI30 vacuum work completed • Beam returned to MI on Wednesday • MI back-fed from Master Sub-Station • KRS T85 work complete, but still using Feeder 45 for MI conventional • Need to schedule a 20 minute MI conventional power outage to remove the back-feed from Master Sub-Station after tunnel work. • MI beam studies • NuMI • Horn scans completed • Target installed • Target scans completed • SY120 • H201-10 magnet replacement • MTest paperwork scheduled for Tuesday, Sept 3rd. • MI Slow extraction studies / extraction to absorber
Neutrino Muon • G2 NM1 Berm Pipe Progress • Final pull this week. M. Geelhoed 8/16/2013
Power Outage • Feeder 43 fault : 0956 Sept 1 • Glitch affected AD accelerators, enclosures, buildings along with FCC and IB complex • A0 switch flashed over • Accelerators were recovered by 1508 • Feeder 43 re-energized at 1702.
August/September 2013 DRAFT
Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html