An Approach to Heat Recovery in Rural Alaska. Introduction Background – Maintenance & Repair Small Scale: 50 kW to 3500 kW Heat Recovery: SAVES Fuel - NOT Primary Heat Keep it SIMPLE. Rules of Thumb. 1/3 Electricity : 1/3 Jacket Water : 1/3 Exhaust 2000 BTU/kW-Hr (jacket water)

sagira
Download Presentation

An Approach to Heat Recovery in Rural Alaska

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An Approach to Heat Recovery in Rural Alaska • Introduction • Background – Maintenance & Repair • Small Scale: 50 kW to 3500 kW • Heat Recovery: SAVES Fuel - NOT Primary Heat • Keep it SIMPLE

  2. Rules of Thumb • 1/3 Electricity : 1/3 Jacket Water : 1/3 Exhaust • 2000 BTU/kW-Hr (jacket water) • 100,000 BTU delivered Heat = 1 gallon #1 Diesel • 0.3 x Power Plant Annual Fuel Use x 0.6 • Pumping Energy Costs <= 10% Fuel Value • Size System Flow for 2/3rds Peak Load

  3. End-Users • Water Plant / Washeteria • Schools • Public Facilities (Clinics, City Offices, Rec Centers) • Ice / Cold Storage (low temp absorption chiller)

  4. Design Considerations • Power Plant Diesels (heat rejection, pump capacity) • No In-Line Booster Pumps • Secondary Pumped Loop • Power Generation = Primary  • End-User Heat Loads • Historical Fuel Use Based • HDD and Composite UA

  5. Design Considerations cont’d • Pumping • Minimize Pumping Energy (valves/restrictions) • Redundancy • Arctic Piping • Welded steel, HDPE jacketed • Copper where indoors/utilidors • Instrumentation • Thermometers (thermo-wells) • Pressure Gauges (isolation valves) • Air Vents (minimize + isolation valves)

  6. Design Considerations – cont’d • Air Control • Air Eliminator (rol-air-trol vs. air scoop) • Expansion Tank Sizing (40F or –40F) • Pre-charge (set for specific application)  • Arctic Piping Loop Fluid • Ethylene / Propylene / Water  • MAINTAINABILITY / ACCESS • Equipment Location • Valving

  7. End-User Connections • Direct Connection • Full Boiler Flow thru Heat Exchanger • Heat Availability close to Boiler Capacity • Partial Boiler Flow thru Heat Exchanger • Heat Availability << than Boiler Capacity

  8. Equipment • Heat Exchangers • P&F Clip on Gaskets (>70 gpm) • Brazed Plate (<70 gpm) • Valves • Lug Style Butterfly • Full Port Ball Valves • (no gate valves) • Arctic Piping • Preinsulated Arctic Pipe Package

  9. Daily Operations • Daily Log • Monitor and Record • Temperatures, Pressures, Pump Operation • Check Glycol Concentration & Inhibitors

  10. Typical Jacket Water Heat Rejection of Diesels

  11. Typical Jacket Water Heat Rejection of Diesels (continued)

  12. 6-Port P&F Heat Exchanger

  13. Wood Boiler & Heat Exchanger

  14. Electric Boiler & Heat Exchanger

  15. Inaccessible Heat Exchanger

  16. Inaccessible Heat Exchanger

  17. AVEC Ambler Plant

  18. AVEC Kiana HRM

  19. AVEC Kiana HRM-radiators

  20. AVEC Anvik Heat Recovery

  21. AVEC Anvik Heat Exchanger

  22. IASD Anvik Heat Recovery Module

  23. IASD Anvik Heat Exchanger

  24. Selawik Power Module

  25. Heat Exchanger & BF-Valve

  26. Secondary Pumped Loop HXR

  27. AMOT Tree

  28. AVEC SelawikHRM-before

  29. AVEC SelawikHRM-New Style